Laserfiche WebLink
KLEIN FELDER <br /> 3 BACKGROUND <br /> 1 <br /> I <br /> The Disco Remediation Area is the site of a former gasoline service station located on the <br /> southern portion of the Del Monte site. The Disco Remediation Area was operated as a service <br /> station until the property was purchased by Del.Monte in 1976. Del Monte never operated the <br /> service station. <br /> Three 10,000 gallon underground storage tanks (USTs) were identified on the Disco site. The <br /> USTs were removed in 1985. During the removal of the USTs impacts to soil beneath the tanks <br /> was noted. The soil was excavated and aerated on the site and backfilled into the excavation. In <br /> 1991, a soil and groundwater investigation began. That investigation included a soil gas survey, <br /> seven soil borings, and installation of eight monitoring wells. The results showed concentrations <br /> of Total Petroleum Hydrocarbon as gasoline (TPH-g) in the soil at depths ranging from 55 feet <br /> below the ground surface (bgs)to 75 feet bgs, and also in the groundwater. <br /> Del Monte, under PHS/EHD direction, conducted a soil and groundwater investigation in 1991 at <br /> the site. The assessment consisted of a soil-gas survey, seven soil borings, and the installation of <br /> eight monitoring wells. The results from the assessment indicated gasoline constituents in soil <br /> and groundwater at depths of 55 to 75 feet bgs. <br /> i <br /> Dei Monte has conducted quarterly monitoring since 1991. Since 1991 to July 1994, the <br /> groundwater flow direction was reported as being to the northwest with an average gradient of <br /> 0.0006 ft/ft. From October 1995 the flow direction changed from northwest to southeast with a <br /> reported average gradient of 0.001 ft/ft. The switch in flow direction was due to the shutdown of <br /> three Del Monte production wells, and reportedly by the shutdown of numerous city municipal <br /> wells in the area. <br /> In February 1995, a soil vapor extraction and air sparging system (SVE/AS) was installed and <br /> operated (CH2M Hill, 19 95) at the site. An estimated 8,787 pounds of TPH-g was removed <br /> while the system was in operation up to November 1995. The SVE/AS was shut down due to <br /> rising groundwater levels above the SVE systems screened ,level, caused primarily by the <br /> shutdown of the Del Monte production wells, and also the numerous city municipal wells <br /> previously mentioned. <br /> The main contaminants are TPH-g, benzene, toluene, ethylbenzene, xylene, and 1,2-DCA. The <br /> site is currently being monitored on a quarterly basis. <br /> 12280.MON/ST02R519 Page 5 of 14 <br /> ©2002,KleinkIder,Inc September 19,2002 <br />