Laserfiche WebLink
4.6 Laboratory Quality Assurance <br /> All samples collected during this project will be analyzed for the selected parameters in accordance with <br /> standard accepted methods.Data packages will be requested from the laboratory for providing quality <br /> control data for data validation. <br /> SECTION 5 <br /> Reporting and Schedule <br /> 5.1 Reporting <br /> The results of the additional sampling and analyses performed for the Disco site will be presented in a <br /> ' report. The report will include cross section(s) and discussion of the nature and extent of 1,2-DCA plume <br /> in groundwater, CPT logs, well completion logs, well development logs, soil boring logs, summary of <br /> results, laboratory analytical data sheets, and conclusions and recommendations. Any significant field <br /> decisions and modifications to this work plan will be documented in the report. <br /> 5.2 Scheduling <br /> The following schedule has been developed. All dates are dependent upon approval of the work plan by <br /> both the SJC PHS/EHD and the RWQCB UST Fund. <br /> Activity Time Period <br /> Submit Work Plan to SJC PHSIEHD December 4,2000 <br /> SJC Approve Work Plan January4,2001 <br /> Obtain All Permits/ February 2,2001 <br /> Receive approval from UST Fund <br /> Perform CPT Investigation February 12-16,2001 <br /> Install wells February 19-March 2,2001 <br /> Develop Wells March 5-7,2001 <br /> Perform Pump Test March 8-9,2001 <br /> Submit Draft Report to Del Monte April 20,2001 <br /> j Submit Report to SJC PHSIEHD April 30,2001 <br /> i I <br /> CATEMPIWoaKPuw_DCF_1.Doc 13 <br />