Laserfiche WebLink
h� KLEINFELDER <br /> ceasing the operation of three Del Monte production wells and numerous city municipal wells in <br /> the area the groundwater elevation has risen approximately 33 feet to its present elevation. <br /> ff flow in the area of the site <br /> The general direction groundwater o gr , based on the most recent data <br /> issued by the San Joaquin County Flood Control and Water Conservation District, (Spring 2003), <br /> andP ast reported data from groundwater monitoring events, is to the southeast. The elevation of <br /> first groundwater is approximately-35 feet below mean sea level. According to the same report, <br /> the depth to groundwater in the vicinity of the project site is approximately 60 feet below grade. <br /> 1 <br /> I <br /> i <br /> M <br /> l <br /> f <br /> I <br /> M <br /> I <br /> 12280.MONISTO5R613/JZ:ly Page 5 of 13 <br /> ©2005,Kleinfelder,Inc. May 20,2005 <br />