My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1943
>
2900 - Site Mitigation Program
>
PR0521767
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 11:54:07 AM
Creation date
12/10/2019 11:27:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0521767
PE
2950
FACILITY_ID
FA0014783
FACILITY_NAME
WIZARD PROPERTIES LLC
STREET_NUMBER
1943
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14109037 ETC
CURRENT_STATUS
01
SITE_LOCATION
1943 E FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01 September 2009 <br /> AGE-NC Project No. 09-1717 <br /> Page 6 of 6 <br /> For the collection of grab ground water samples,the soil probe boring will be advanced to the top of <br /> the ground water table. Once ground water has been encountered, a Geoprobe push-driven water <br /> sampling device will be advanced two to three feet into the water-bearing zone.A grab ground water <br /> sample will be collected using a Geoprobe water sampling assembly fitted with a pre-cleaned, <br /> one-inch diameter 0.01-slotted temporary well screen. The ground water sample will be extracted <br /> using inertial action by lowering Teflon tubing through the hollow center of the push rods into the <br /> screen section. <br /> Ground water sample containers are labeled with soil boring designation, date, time, and samplers <br /> initials.Appropriately sealed and labeled samples will be placed into a chilled container under ice and <br /> transported under chain-of-custody procedure to a CDPH-certified laboratory. <br /> 4.4. EQUIPMENT DECONTAMINATION <br /> Prior to use,all sampling tools used for sample collection will be thoroughly rinsed with clean water <br /> after being washed with a solution ofAlconox.All probing rods will be cleaned prior to advancement <br /> at each probe boring location. <br /> 4.5. BORING ABANDONMENT <br /> The probe borings will be permanently sealed to prevent vertical migration ofpotential contaminants. <br /> Soil borings shall be abandoned by backfilling with portland cement from the total depth to surface <br /> grade. <br /> Advmiced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.