Laserfiche WebLink
01 September 2009 <br /> AGE-NC Project No. 09-1717 <br /> Page 4 of 7 <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Rebecca E. Natal/William R. Little Collect soil; direct drilling <br /> FIELD CREW: TASK: <br /> Geoprobe Operator Advance borings <br /> Field Technician (if nec.) Clean equipment, assist operator <br /> The works party(ies) shall be briefed on the content of this plan prior to initiating onsite work. <br /> 7.0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used: <br /> Hand gripping throat: Out of air; can not breath <br /> Grip partner's wrist or both hands around waist: Leave area immediately <br /> Hands on top of head: Need assistance <br /> Thumbs up: OK; I am alright; I understand <br /> Thumbs down: No; negative <br /> 8.0. EMERGENCY MEDICAL CARE <br /> San Joaquin General Hospital located at 500 West Hospital Road and is approximately 14 minutes <br /> from the site. Route to the hospital: From the site, south on East Fremont go west on Highway 4, <br /> then south on Interstate-5,exit at W.Mathews Road turn west onto W.Mathews Road then north on <br /> S. Manthey Road then west on W. Hospital Road the hospital is on the right. A map depicting the <br /> route to this facility is attached. <br /> Advanced GeoEnvironvaental,Inc. <br />