My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 7:32:18 PM
Creation date
12/10/2019 11:28:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011009
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ r <br /> i } <br /> InfoPmelin <br /> Youp� � IAbout <br /> eoenviponmenlel <br /> i <br /> Geoenvironmental studies are commissioned to gain information Should you become aware of any change, do not rely on a geoenvi- <br /> about environmental conditions on and beneath the surface of a site. ronmental report.Advise your geoenvironmental professional imme- <br /> .The more comprehensive the study,the more reliable the assessment diately;follow the professional's advice. <br /> is likely to be. But remember:Any such assessment is to a greater or <br /> lesser extent based on professional opinions about conditions that Recognize the Impact of TO <br /> cannot be seen or tested.Accordingly,no matter how many data are A geoenvironmental professional's findings, recommendations,and <br /> f developed, risks created by unanticipated conditions will always conclusions cannot remain valid indefinitely. The more time that <br /> i remain. Have realistic expectations.Work with your geoenvironmental passes,the more likely it is that important latent changes will occur. <br /> consultant to manage known and unknown risks. Part of that process Do not rely on a geoenvironmental report if too much time has <br /> should already have been accomplished,through the risk allocation elapsed since it was completed.Ask your environmental professional <br /> provisions you and your geoenvironmental professional discussed to define "too much time." In the case of Phase I Environmental Site <br /> and included in your contract's general terms and conditions.This Assessments(ESAs),for example,more than 180 days after submis- <br /> document is intended to explain some of the concepts that may be sion is generally considered "too much." <br /> included in your agreement,and to pass along information and sug- <br /> gestions to help you manage your risk. PPBpaPe b Deal Wkh UnaMOaNd Conditions <br /> f The findings, recommendations,and conclusions of a Phase I ESA <br /> i Beware of Change;Keep YauP 6enenulPomneldal report typically are based on a review of historical information, inter- <br /> PPefessional Adufsed views,a site"walkover,"and other forms of noninvasive research. <br /> The design of a geoenvironmental study considers a variety of factors When site subsurface conditions are not sampled in any way,the risk <br /> that are subject to change. Changes can undermine the applicability of unanticipated conditions is higher than it would otherwise be. <br /> of a report's findings, conclusions,and recommendations.Advise <br /> your geoenvironmental professional about any changes you become While borings, installation of monitoring wells,and similar invasive <br /> aware of.G eoenvi ron mental professionals cannot accept responsibili- test methods can help reduce the risk of unanticipated conditions, do <br /> ty or liability for problems that occur because a report fails to consid- not overvalue the effectiveness of testing,Testing provides informa- <br /> er conditions that did not exist when the study was designed.Ask tion about actual conditions only at the precise locations where sam- <br /> your geoenvironmental professional about the types of changes you Ales are taken,and only when they are taken.Your geoenvironmental <br /> should be particularly alert to.Some of the most common include: professional has applied that specific information to develop a gener- <br /> a modification of the proposed development or ownership group, al opinion about environmental conditions.Actual conditions in areas <br /> • sale or other property transfer, not sampled may differ(sometimes sharply)from those predicted in a <br /> • replacement of or additions to the financing entity, report. For example,a site may contain an unregistered underground <br /> • amendment of existing regulations or introduction of new ones, storage tank that shows no surface trace of its existence. Even condi- <br /> or tions in areas that were tested can change,sometimes suddenly,due <br /> • changes in the use or condition of adjacent property. to any number of events, not the least of which include occurrences at <br />
The URL can be used to link to this page
Your browser does not support the video tag.