Laserfiche WebLink
31604.DSK <br /> WP-SFO <br /> 3.8 JUNCTION AND PULL BOXES <br /> A. Where indicated on the Drawings, and where necessary to terminate, <br /> tap-off, or redirect conduit runs, provide and install approximately designed <br /> junction boxes. Furnish and install pull boxes where necessary in the <br /> raceway system to facilitate conductor installation. <br /> B. Install boxes in a secure, substantial manner, supported independently of <br /> conduit by attachment to the structure or structural member. <br /> 3.9 DISTRIBUTION PANELBOARDS <br /> A. Mount panelboards securely where indicated, plumb, in-line, and square <br /> with walls. Unless otherwise indicated, mount panelboards with top of its <br /> cabinet approximately 6 feet above the floor. Provide a typewritten circuit <br /> directory under a metal-framed transparent plastic cover inside each <br /> panelboard. Provide an engraved, laminated plastic nameplate on the <br /> outside of the panelboard showing the panelboard designation, voltage, and <br /> phases. <br /> 3.10 IDENTIFICATION SYSTEM <br /> A. All raceways, isolated conductors and control cables (including individual <br /> internal circuits) shall be permanently tagged such that circuits can be easily <br /> traced from origin to final destination. <br /> 3.11 CIRCUITS <br /> A: General: <br /> 1. Do not exceed cable manufacturer's recommendations for maximum <br /> pulling tensions and minimum bending radii. Where pulling <br /> compound is used, use only. UL-listed compound compatible with the <br /> cable outer jacket and with the raceway involved. <br /> 2. Tighten all screws and terminal bolts using torque type wrenches <br /> and/or drivers to tighten to the inch-pound requirements of the NEC <br /> and UL. <br /> 3. Each wire and cable shall be tagged at each termination. All wiring <br /> entering and exiting the control panels shall be bundled into groups <br /> and clearly labeled as to the field destination of the wiring. <br /> 3.12 LUMINAIRES <br /> A. General: <br /> 1. Install each luminaire in a manner recommended by the luminaire <br /> manufacturer and accepted by the Engineer. <br /> 2. After construction of total project is completed, remove all labels and <br /> other markings, wash dirty luminaires inside and out with a <br /> nonabrasive mild soap or cleaner. Clean luminaire plastic lenses with <br /> antistatic cleaners only. Touch up all painted surfaces of luminaires <br /> with high-grade exterior enamel, and poles with paint supplied by <br /> manufacturer. <br /> BAE31604.AS.T 1 <br /> 16005 9 ELECTRICAL SYSTEM <br />