My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 8:05:29 PM
Creation date
12/10/2019 11:39:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011018
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> i August 30, 1994 <br /> BAE31604.AS.T8 <br /> SCHEDULE AND REMEDIATION PROGRESS <br /> Del Monte is preparing for construction of the ASISVE treatment system. They have <br /> signed a contract with a remediation contractor, and they are presently negotiating with <br /> well drilling contractors. The San Joaquin Valley Unified Air Pollution Control District <br /> has approved Del Monte's Authority to Construct Permit. <br /> The current schedule of monitoring and remediation activities is presented on Table 3. <br /> Construction of the AS/SVE system is scheduled to begin with the building permit approval <br /> process and the purchase of long lead-time equipment. The building permit approval is <br /> expected to take approximately 4 weeks. Quarterly sampling scheduled for October 1994 <br /> will serve as the baseline for evaluating ASISVE performance. Del Monte initially plans to <br /> operate the system continuously for a period of approximately 15 weeks. <br /> If you have any questions or comments, please call me at 510/251-2888 (ext. 2097) or <br /> Bern Baumgartner (ext. 2118). <br /> Sincerely, <br /> CH2M HILL <br /> zq <br /> Grant L. Stewart, P.E. <br /> Project Manager <br /> h:\projects\31604\gw\augqtr.wp5 <br /> cc: Mr. Lee Bosche/Del Monte Engineering <br /> Mr. Soon Kim/Del Monte Engineering <br /> Mr. Fred Mehr/Del Monte Plant 33, Environmental Coordinator <br /> Mr. Ray Volan/Del Monte Real-Estate <br /> Mr. Bern Baumgartner/CH2M HILL/SFO <br /> Mr. Jim Hartley/CH2M HILL/SAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.