Laserfiche WebLink
FIGURE B-1 <br /> PROPOSED PROJECT SCHEDULE FOR DISCO TANK LOCATION <br /> (Schedule begins upon San Joaquin County PHS approval of workplan.) <br /> WEEKS AFTER PHS APPROVES WORKPLAN <br /> TASK 1 2 31-4 5 617 1819 10 11 12 13 14 115 116 17 18 119 20 21122 123 124 25 126 127 28 29 31 <br /> Field Work Preparation <br /> Soil—Gas Survey <br /> Soil Boring Sampling <br /> Lab Analyses of Soil Samples <br /> Groundwater Well Installation <br /> Lab Analyses of Water Samples <br /> Report & Recommendations F <br /> 1 Ll <br /> LEGEND <br /> ■ CH2M HILL <br /> Del Monte <br /> D Draft <br /> F Final <br />