Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> J <br /> INTRINSIC MONITORING WELL FIELD LOG <br /> 1996 <br /> PROJECT NAME:.-Del Monte Corporation AMPLE ANALYSIS PERFORMED : SEE C. OF C. <br /> f Filbert Road' MPLE TIME: 18:15 ITB/18:40 VOC <br /> Stockton,CA AMPLE CONTAINER(S): 9 CONTAINERS <br /> ALYSIS PERFORMED BY:QALI SHERWOOD LABS <br /> LIENT: CH2M HILL/DEL MONTE ATE: 08/15/1996 <br /> ROJECT MANAGER: GRANT/RICH AMPLE LOCATION: MW-DIS-8S <br /> MPLER: DON LIGHT TART TIME: <br /> GROUNDWATER: XXX ADOBE: OTHER: P.I.D.WELL HEAD READING 0.0 PPM <br /> jCASING ELEVATION: FEET MSLj CASING DIAMETER:4 INCH <br /> JEPTH TO WATER: 58.96 FEET ALCULATED CASING VOLUME: 17.01 GAL. <br /> DEPTH OF WELL: 85.02 FEET OTAL VOLUME PURGED: 70.0 GAL. <br /> TIME VOLUME . , pH E.C.umbos/cm, TEMP. COLOR O.R.P. <br /> gallons units Degrees C (Visual)I <br /> drainrdown D.D.ppm. <br /> 17:28 0.0/59.24 7.0 893 22.9 1.0 PPM/ 002 <br /> CLEAR/NO <br /> ODOR <br /> 17:33 17.0/59.10' 7.0 880 22.6 0.3 PPM/" 005 <br /> 17:48 34.0159.11' 6.8 822 22.6 0.2 PPM 1" 010 <br /> 17:43 51.0/59.12' 6.7 806 22.5 0.1 PPM/4 022 <br /> 18:00 68.0159.10' 6.8 815 22.6 0.1 PPM/" 019 <br /> 18:15 70.0159.10' 6.9 992 21.6 0.1 PPM 1" 019 <br /> PURGE METHOD:- 2"GRUNDFOS SUBMERSIBLE PUMP. <br /> SAMPLE METHOD: 1'STAINLESS STEEL BAILER: <br /> DEPTH TO WATER AFTER PURGE: DEPTH TO WATER AT SAMPLE TIME: 59.10' <br /> WELL INTEGRITY: CAP AND SEAL ARE SECURE, LOCK IS INSTALLED. <br /> REMARKS: GOOD RECHARGE. <br /> WEATHER: CLEAR SKIES. <br /> QUALITY CONTROL: ALL PURGING EQUIPMENT AND SAMPLING EQUIPMENT WAS CLEANED <br /> IN THE FIELD WITH STEAM CLEANER&ALCONOX. <br /> NEW NITRILE GLOVES WERE WORN AT ALL TIMES. <br /> WELL LOCATION: SEE SITE MAP. <br /> CONTAINMENT: D.O.T. 17 DRUMS <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0&7.0) <br /> ORION CONDUCTIVITY METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 58013.PHOTO IONIZATION DETECTOR <br />