Laserfiche WebLink
Ms. Diane Hinson and Ms. Margaret Lagorio <br /> Page 3 <br /> ( August 27, 1995 <br /> quarterly for the parameters specified in CH2M HILL's SOP as part of the ongoing quarterly <br /> groundwater monitoring program at the Disco Site. In addition, data collected from <br /> monitoring well MW-1 and the existing piezometers for the air sparging and soil vapor <br /> extraction system may also provide useful information for the demonstration study. <br /> Table 1 <br /> MonitorinR Wells for Intrinsic Bioremediation Demonstration <br /> Monitoring Well Rationale for Well Selection <br /> MW-DIS-9 Located upgradient, back round well . <br /> MW-DIS-2 Located within dissolved plume; outside of air sparging/soil vapor <br /> extraction radius of influence <br /> MW-DIS-8S and 8D Located at downgradient frin a of plume <br /> MW-DIS-3 Located near fringe of plume <br /> After four quarters of data are collected for the demonstration study, CH2M HILL will <br /> evaluate the biodegradation activity at the Disco Site and the potential for biodegradation <br /> activity to limit or reverse the gasoline plume. Based on the results, CH2M HILL will provide <br /> recommendations for long term management and remediation of the gasoline plume. <br /> In the August 17, 1995 letter, PHS/EHD requested confirmation sampling in other areas of <br /> the groundwater contamination plume. CH2M HILL feels that confirmation sampling, may <br /> not be necessary due to the number of data points proposed for the demonstration study. <br /> However, this should be further discussed and evaluated after the four quarters of data is <br /> collected and if the data is inconclusive. <br /> PHS/EHD also requested information about the radius of influence of the existing soil vapor <br /> extraction (SVE) and air sparging (AS) system at the Disco Site. Based on data from the <br /> existing piezometers, the radius of influence of the SVE system is approximately 25 feet and <br /> the radius of influence of the AS system is approximately 10 to 25 feet. This information is <br /> further discussed in the recent quarterly monitoring report dated August 11, 1995. <br /> Schedule <br /> The schedule to implement the intrinsic bioremediation demonstration study is shown in Table <br /> 2. The quarterly monitoring activities for the demonstration study will occur concurrently <br /> with the ongoing quarterly groundwater monitoring program at the Disco Site.. Data from the <br /> demonstration study will be included with the quarterly groundwater monitoring reports for <br /> the Disco Site. <br />