My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011359
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 7:33:46 PM
Creation date
12/10/2019 11:47:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011359
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
697
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dei Monte AS/cat Cast.Est <br /> 1+ Del Monte Plant 33 <br /> Air Stripper and Offgas Control (catalytic oxidation) <br /> ! SFO31604.DA <br /> QTY Unit $/unit COST COMMENT <br /> SITEWORK <br /> .Site Preparation 1 LS 5,000 5,000 Allowance <br /> EQUIPMENT <br /> Flow EQ Tank 1 LS $6,000 $6, 000 3,000 gal tank <br /> Influent Pumps 4 each $1, 500 $6, 000 <br /> i . Air Stripping System 2 each $15,000 $30,000 <br /> Acid Addition System 1 LS $4,000 $4, 000 <br /> Caustic Add. System 1 LS $4,000 $4, 000 <br /> j Blowers 2 each $2,000 $4, 000 <br /> Effluent Pumps 2 each $1,500 $3, 000 <br /> Catalytic Ox Unit 1 LS $65, 000 $65,000 <br /> Subtotal = 127,000 <br /> Unquantified Items (5% of subtotal) 6,350 <br /> Freight Allowance (10% of subtotal) 12,700 <br /> Installation Allowance (15% of subtotal) 19, 050 <br /> Subtotal = 165,100 <br /> j MECHANICAL ( 15% of Equipment Total ) 24,765 <br /> ELECTRICAL & I&C ( 15% of Equipment Total ) 24,765 <br /> CONSTRUCTION COST SUBTOTAL 214,630 <br /> Contingency ( 25% of CCS ) 53, 658 <br /> TOTAL CONSTRUCTION COST 268,288 <br /> Mob,Demob,Bonding, & Insurance ( 8% of TCC ) 21, 463 <br /> Permitting & Legal ( 5% of TCC ) 13, 414 <br /> Services During Construction ( 5% of TCC ) 13, 414 <br /> Start-Up Costs ( 5% of TCC ) ----13,414 <br /> TOTAL IMPLEMENTATION COST 329, 993 <br /> Engineering Design Costs ( 12% of TIC ) 39, 599 <br /> TOTAL CAPITAL COST 370,000 <br /> i <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.