My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011359
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FILBERT
>
110
>
3500 - Local Oversight Program
>
PR0545039
>
ARCHIVED REPORTS_XR0011359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 7:33:46 PM
Creation date
12/10/2019 11:47:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011359
RECORD_ID
PR0545039
PE
3528
FACILITY_ID
FA0010186
FACILITY_NAME
DEL MONTE FOODS PLNT #33 - DISCO WH
STREET_NUMBER
110
Direction
N
STREET_NAME
FILBERT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702009
CURRENT_STATUS
02
SITE_LOCATION
110 N FILBERT ST
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
697
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Del Mote UIV Per Cost Est <br /> Del Monte Plant 33 <br /> UV/Peroxide System <br /> SF031604.DA <br /> QTY Unit $/unit COST COMMENT <br /> SITEWORK <br /> I <br /> Site Preparation 1 LS 5,000 5,000 Allowance <br /> EQUIPMENT <br /> Flow EQ Tank 1 LS $6,000 $6, 000 3,000 gal tank <br /> Influent Pumps 2 each $1, 500 $3,000 <br /> UV/Perox System 1 each $70,000 $70,000 <br /> Peroxide Add System 1 LS $4, 000 . $4,000 <br /> Effluent Pumps 2 each $1,500 $3,000 <br /> I Subtotal = 91, 000^ <br /> i . Unquantified Items (5% of subtotal) 4,550 <br /> Freight Allowance (10% of subtotal) 91100 <br /> Installation Allowance (15% of subtotal) 13, 650 <br /> Subtotal = 118,300 <br /> MECHANICAL ( 15% of Equipment Total ) 17,745 <br /> 1 ELECTRICAL & I&C ( 15% of Equipment Total ) 17,745 <br /> CONSTRUCTION COST SUBTOTAL 153,790 <br /> Contingency ( 25% of CCS ) 38, 448 <br /> TOTAL CONSTRUCTION COST 192,238 <br /> Mob,Demob,Bonding, & Insurance ( 81 of TCC ) 15, 379 <br /> Permitting & Legal ( 5% of TCC ) 9, 612 <br /> Services During Construction ( 5% of TCC ) 9,612 <br /> Start-Up Costs ( 5% of TCC ) 9, 612 <br /> TOTAL IMPLEMENTATION COST 236,453 <br /> Engineering Design Costs ( 12% of TIC ) 28,374 <br /> TOTAL CAPITAL COST ' 265,000 <br /> I <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.