Laserfiche WebLink
1 <br /> ' 1 <br /> a CASE NARRATIVE <br /> `= Engineers Metals <br /> - Planners <br /> Economists 30654 <br /> - Scientists <br /> I. H21ding Time: <br /> All holding times were met. <br /> II. Analysis: <br /> A. B s: i <br /> All acceptance criteria were met. <br /> B. Calibration: <br /> All acceptance criteria were met. <br /> C. ICE interference_ Check SAM21e: f <br /> All acceptance criteria were met. <br /> D. Spike Sample Analysis: <br /> All recovery criteria was met. <br /> E. Duplicate Sample Analysis: <br /> All duplication criteria was met. <br /> F. Laboratory Control Sampje Analysis: <br /> All acceptance criteria. were met.. <br /> G. .1CP Serial 'on: <br /> Not required for this level QC. <br /> H. Other: <br /> None. <br /> III. I certify that this data package is in compliance with the <br /> terms and conditions agreed to by the client and CH2M HILL, <br /> both technically and for completeness, for other than the <br /> conditions detailed above. <br /> signed:_ Date: ro <br /> /Cfl <br /> Fred Bickell <br /> Cations Supervisor <br /> I <br /> j <br /> CH2M HILL Redding Environmental Laboratory 5090 Caterpillar Road 9?6.244.5227(� <br /> Redding,California 96003 <br />