Laserfiche WebLink
I . <br /> Engineers <br /> Planners CASE NARRATIVE <br /> Metals <br /> Qin Economists <br /> scientists 30344 <br /> I. Molding Time: <br /> All holding times were met. <br /> II. Analysis: <br /> A. Blanks: <br /> All acceptance criteria were met. <br /> B. . Calibration: <br /> All acceptance criteria were met. <br /> C. ICP Interference Check Sample: <br /> All acceptance criteria were met. <br /> D. Spike Sample Analysis: <br /> All recovery criteria were met. ` <br /> E. Duplicate Sample Analysis: � . <br /> All duplication criteria were met. <br /> F. Laboratory Control Sample Analysis: <br /> All acceptance criteria- were met. <br /> G. ICP Serial Dilution: I <br /> Not required for this level QC. <br /> H: Other: <br /> None. <br /> III. I certify that this data package is in compliance with the <br /> terms and conditions agreed to by the client and CH2M HILL, <br /> both technically and for completeness, for other than the <br /> conditions detailed above. <br /> Signed: ( Date: 8 to <br /> Fred Bickell <br /> Cations Supervisor <br /> 1 <br /> CH2M HILL Redding Environmental Laboratory 5090 Caterpillar Road 996.244.5227 <br /> Redding,California 96003 <br />