Laserfiche WebLink
i <br /> �l <br /> Engineers CASE NARRATIVE <br /> = Planners Metals . <br /> Economists <br /> Scientists 30688 <br /> I. Holding Time: <br /> Ail holding times were -met. <br /> II. ' Analysis: <br /> A. Blanks: <br /> All acceptance criteria were met. <br /> B. Calibration• <br /> All acceptance criteria were met. <br /> C. ICP Interference Check Sample: <br /> All acceptance criteria were met. <br /> D. Spike Sample Analysis: <br /> All recovery criteria was met. <br /> E. Duplicate Sample Analysis: <br /> All duplication criteria was met. <br /> F. Laboratory Control Sample Analysis: <br /> All acceptance criteria were met. <br /> i <br /> G. ICP Serial Dilution: <br /> Not required for this level QC. <br /> H. Other: <br /> None. • <br /> III. I certify that this data package is in compliance with the <br /> terms and conditions agreed to by the client and CH2M HILL, <br /> both technically and for completeness, for other than the <br /> conditions detailed above. <br /> i <br /> • I <br /> Signed: Date: gr <br /> Fred Bickell <br /> Cations Supervisor <br /> r <br /> , <br /> G 'UvL01 <br /> CH2M HILL Redding Environmental Laboratory 5090 Caterpillar Road 916.244,5227 <br /> Redding,California 96003 <br />