Laserfiche WebLink
.r <br /> 4U!N <br /> COUNTY OF SAN JOAQUIN <br /> THOMAS R. FLINN <br /> _ Z-+ DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> H. P.O. BOX 1810 1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> DEPUTY DIRECTOR <br /> STOCKTON,CALIFORNIA 95201-1810 <br /> cq, ;P • 209/468-3000 STEVEN WINKLER <br /> ��ROR FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR RECEIVED <br /> APR 16 1997 <br /> April 15, 1997 Community Development Dept. <br /> M E M O R A N D U M <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Chandler T. Martin <br /> FROM: Tom M. Iwamiya, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-97-16 A SITE APPROVAL APPLICATION TO CONSTRUCT A <br /> 30 FOOT BY 60 FOOT FARM MACHINERY REPAIR SHOP, LOCATED <br /> ON THE NORTH SIDE OF WEST RIPON ROAD, 1, 650 FEET EAST OF <br /> ALICE ROAD. (DISTRICT 5) . <br /> APPLICANT: Anthony Souza APN: 243-180-28 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> West Ripon Road has an existing right-of-way width of 60 feet and a <br /> planned right-of-way width of 84 feet . <br /> RECOMMENDATIONS : <br /> 1 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Section 9-1145 .4) <br /> 2 . The driveway approach shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to <br /> issuance of the occupancy permit . <br /> (Development Title Section 9-1145 .5) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building <br /> permit application. (The fee currently is $572 . 00 per 1, 000 gross <br /> square foot of building as Manufacturing or $148 . 67 per daily <br /> trip-end generated in the Manteca area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News <br /> Record. ) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and <br /> R-96-592) <br /> TMI :RWH:bn <br /> as-7Di_:.31 <br /> E: Manuel Lopez, Deputy Director/Development <br />