My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIRST
>
1116
>
3500 - Local Oversight Program
>
PR0545046
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 6:31:00 PM
Creation date
12/10/2019 3:52:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545046
PE
3528
FACILITY_ID
FA0003700
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #3
STREET_NUMBER
1116
Direction
E
STREET_NAME
FIRST
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16903006
CURRENT_STATUS
02
SITE_LOCATION
1116 E FIRST ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a 1%0 <br /> ATCAssociates STTE SAFETY PLATY <br /> KMY SAFETY PERSONNEL AND RESPONSIBILITIES <br /> All permaaei working for ATC at the job site are responsible for project safety. The operational and health <br /> and sadfety responsibilities of pertinent ATC personnel are identified burr. <br /> .. ...... .. .. <br /> PROJ .Ieanne Homsey <br /> The Project Manager is ramble for the provisions and submittal of Ibis SSP to the Site Safety Officer <br /> (SSO) *ad for advising the SSOI on health and safety matters. He hair the authority to provide for the <br /> audio"of compliance nce with the provisions of this SSP,suspend or modify work practices,and to recownwad <br /> disciplinary action'forha hidusls wbose conduct does not and the provisions presented in this SSP. The <br /> Presject Manager:is.also re*onsiblae for ea curing that M+edicad Surveillance Zzww and Training Program <br /> am current fur:ate:permmeel working ori-site,.. The Project Manager reports to the Corporate Safety <br /> Manager. <br /> SITE SAFETY ODFFICEIL Tom Lxatterman <br /> Ilse SSOD is responsible for the dissemisatioa of the information contained to this SSPIs all ATC personnel <br /> working at the job site,and to the risible represesltative(s)of each subcontractor firm working for ATC <br /> at the job site. The SSU Is responsible for ensuring the following items are adequately addressed: Safety <br /> Supplies and Fquipn"t Inventory; Accidentan+cident Reporting Procedures <br /> IlecontaminationlContmination Reduction Procedures;General Safe Work Practices. <br /> The SSO)has the authority to suspend work anytime shelbe determines the safety provisions set-forth in this <br /> SSP am ink to ensure worker safety. The SSH shall go inforin the Project Manager of individuals <br /> whose coact does not neet the safety provisions of this SSP. The Ske Safety Officer reports to the Project <br /> Manager. A SSO or alternate must be present during the Add work operations. <br /> PAGE 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.