My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0011662
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIRST
>
1116
>
3500 - Local Oversight Program
>
PR0545046
>
ARCHIVED REPORTS_XR0011662
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2019 6:17:08 PM
Creation date
12/10/2019 4:44:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011662
RECORD_ID
PR0545046
PE
3528
FACILITY_ID
FA0003700
FACILITY_NAME
CITY OF STOCKTON FIRE STATION #3
STREET_NUMBER
1116
Direction
E
STREET_NAME
FIRST
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16903006
CURRENT_STATUS
02
SITE_LOCATION
1116 E FIRST ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: CITY OF STOCKTON- FIRE#3 Project No.: 98-0438 BORING NO.: <br /> Site Address: 1116 EAST FIRST STREET Total Depth: 65 MW1 <br /> STOCKTON, CA 95202 Date: 20 July 1998 <br /> Drilling Co.: Soils Exploration Services Logged by: Mc Kibben Page 2 of 2 <br /> Rig/Auger Type: CME 75 / 8" hollow stem Reviewed by: Henderson <br /> G41;�� �Qvo�o Litholog�c Description <br /> MW 1-45 0 6,13,24 ML j Brown,damp,clayey SILT,no HC odor. <br /> - ISI <br /> 50— MW1-50 7 13,42,50-3" ML ! Brown,damp SILT,slight HC odor. <br /> I � <br /> MW1-55 7 7,20,25 ML Brown,saturated,sandy SILT,slight HC odor. <br /> 60— MW 1-60 1 10,25,47 ML j Brown,saturated,SILT,no HC odor,slight oxidation. <br /> MW1-65 0 9,21,31 ML 1 Brown,saturated,sandy SILT,no HC odor <br /> – Notes: <br /> Boring MW-1 terminated at a total depth of 65 feet <br /> 70— below surface grade (bsg). completed as a monitoring <br /> well utilizing two-inch diameter PVC casing. <br /> - Saturated soil encountered between 52 and 65 feet bsg. <br /> AS-BUILT CONSTRUCTION DETAILS:MW-1 <br /> Screen Interval : 65 to 45 feet bsg <br /> - Blank Interval : 0 to 45 feet bsg <br /> Sand Interval : 65 to 43 feet bsg <br /> 80— Bentonite Plug : 43 to 41 feet bsg <br /> Grout Seal : 0 to 41 feet bsg <br /> Advanced Lea <br /> GeoEnviron mental, Inc. <br /> L:IAMIPRO\BORING-HEIR#3MWI.SAM 10122/98@ 8:26 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.