My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FIRST
>
1303
>
2900 - Site Mitigation Program
>
PR0531103
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 8:57:25 AM
Creation date
12/11/2019 8:33:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0531103
PE
2950
FACILITY_ID
FA0020032
FACILITY_NAME
C A MATT FORMER TEXACO
STREET_NUMBER
1303
STREET_NAME
FIRST
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22709001
CURRENT_STATUS
01
SITE_LOCATION
1303 FIRST ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Initial Study <br /> Mitigation Measures <br /> Mitigation Measure HAZ-1: Prior to demolition of the four buildings located at 1303 First <br /> Street,the residence at 1740 McHenry Avenue,and the residence at 1750 McHenry Avenue, <br /> asbestos and lead-based paint surveys must be conducted. Information on the presence <br /> or absence of lead-based paint must be obtained for proper employee training and work <br /> practices during demolition of these buildings. Information on the presence or absence <br /> of asbestos shall be indicated in the National Emissions Standards for Hazardous Air Pollutants <br /> (NESHAP)notification form prior to demolition of these six buildings.The City,or the City's <br /> contractor, is required to submit notice of demolition to the San Joaquin Valley Unified Air <br /> Pollution Control District and identify whether or not asbestos is determined to be present <br /> in the structures proposed for demolition. <br /> Mitigation Measure HAZ-2: Prior to construction, the City shall ensure that the <br /> recommendations included in the Phase I Addendum Report are implemented. These <br /> recommendations state that subsurface soil in the ROW in the vicinity of the former UST <br /> excavations in the northwest comer of the property and on the west side of the office building, <br /> at the former Texaco gas station site at 1303 First Street should be sampled for petroleum <br /> constituents in accordance with San Joaquin County Environmental Health Department <br /> (SJCEHD) requirements and, if necessary, remediated prior to construction. The <br /> recommendations also state that surface soil in the ROW in the vicinity of the former PG&E <br /> transformer sub-station site at 1828 McHenry Avenue should be sampled for PCBs in <br /> accordance with SJCEHD requirements and, if necessary,remediated prior to construction. <br /> References <br /> California Department of Forestry and Fire Protection(FRAP).2005.Fire Threat. October 20, <br /> 2005. <br /> California Environmental Protection Agency(CalEPA). 2008. Cortese List Data Resources. <br /> hfp://www.calepa.ca.eov,SiteCleaiiup/Cot-tesel,ist . Accessed December 29,2008. <br /> Ogden Environmental and Energy Services Co.,Inc. (Ogden). 1995.Addendum Report to the <br /> Phase I Environmental Site Assessment,Highway 120 Realignment and Escalon/McHenry <br /> Avenue Widening Projects, Escalon, California. December 1995. <br /> McHenry Avenue Road Widening Project 37 ESA 121A599 <br /> Initial Study May 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.