Laserfiche WebLink
i <br /> v <br /> v <br /> A S S O C I A T E S I N C <br /> i <br /> Receptor Survey <br /> ATC will conduct a well survey and provide locations. of all agricultural, industrial, domestic, <br /> municipal, and other wells within a 2,000-foot radius of the site. This will include a review of the <br /> Department of Water Resources well construction log database in Sacramento, PHS/EHD <br /> records, and City of Stockton records. Pumping influences will be evaluated with respect to <br /> observed receptors. <br /> Summary Report Preparation <br /> ATC will prepare a final summary report for the site. This report will summarize all site activities, <br /> analytical results, mass balance calculations, receptor survey results, and contain <br /> recommendations. A copy of the report will be submitted to PHS/EHD. <br /> All work described in this workplan will be performed under the direction of a California <br /> Registered Professional Engineer. All work will be performed in accordance with ATC's Site <br /> Safety Plan (SSP) contained in Attachment 2 and Quality Control/Quality Assurance Plan in <br /> Attachment 3. <br /> .PROJECTED SCHEDULE <br /> Once approval of this workplan has been received, ATC will schedule pumping test and drilling <br /> activities. ATC will notify PHS/EHD at least 48 hours prior to beginning any field activities. The <br /> summary report will be submitted to PHS/EHD approximately four to five weeks after the <br /> completion of field activities. <br /> If you have any questions regarding this workplan, please contact us at (209) 579-2221. <br /> Respectfully submitted, <br /> ATC Associates Inc. <br /> Drew Van Allen <br /> Staff Scientist <br /> �i`) <br /> Jeanne Hornsey, P.E. t` CAP, <br /> Registered Engineer No. C474 10 <br /> syr <br /> Attachments <br /> cc: James Giottonini, City of Stockton Public Works Department <br /> Mark List, RWQCB <br /> w:\62574\62574.02\reports\pumpwkp.doc 4 <br /> I ^ <br />