Laserfiche WebLink
TABLE 2 <br /> Groundwater Monitoring Data <br /> Smiths Canal Pump Plant <br /> Page 2 of 7 <br /> E- � Date Well ID Wellhead Elevation Depth-to-Water Water Table Elevation <br /> 08/20/92 MW 1 100.00 17.04 82.96 <br /> r MW2 96.61 15.46 81,15 <br /> MW3 98.13 14,09 84.04 <br /> MW4 99.57 16.392 83.18 <br /> 09/14/92 MWl 100.00 17.34 82.66 <br /> MW2 96.61 16.10 80.51 <br /> '== MW3 98.13 14.42 83.71 <br /> MW4 99.57 16.70' 82.87 <br /> 12/09/92 MWl 100.00 16.99 83.01 <br /> MW2 96.61 15.80 80.81 <br /> MW3 98.13 14.12 84.01 <br /> MW4 99.57 16.38' 83.19 <br /> 03/31/93 MW1 100.00 13.01 86.99 <br /> MW2 96.61 11.32 85.29 <br /> MW3 98.13 9.76 88.37 <br /> MW4 99.57 12.48' 87.09 <br /> �s <br /> F' 06/09/93 MW1 100.00 14.15 85.85 <br /> 4: <br /> MW2 96.61 12.55 84.06 <br /> F s: MW3 98.13 10.91 87.22 <br /> - MW4 99.57 13.57' 86.00 <br /> 08/10/933 MW1 5.36 15.26 -9.90 <br /> MW2 3.36 13,78 -10.42 <br /> f=i MW3 1.71 12.09 -10.38 <br /> Ji MW4 4.84 14,76' -9.92 <br /> MW5 2.11 11.35 -9.24 <br /> r4 MW6 4.05 14.44 -10.39 <br /> c's>i <br /> 12/01/93 MWl 5.36 15.86 -10.50 <br /> MW2 3.36 14.46 -11.10 <br /> MW3 1.71 12.80 -11.09 <br /> -;i MW4 4.84 15.32' -10,48 <br /> '- MW5 2.11 11.88 -9.77 <br /> „1 MW6 4.05 15.15 -11.10 <br /> c=1 <br /> w:1943691#ableslgwelev.doc <br /> F_' <br />