Laserfiche WebLink
= `f WORK REQUEST FORM <br /> Date of Request: 071000 Requested Completion Date: 071400 <br /> Proj Name: Stockton Smith Canal Proj No: 5462574.0002 <br /> Site Address:Fontana St. & Smith Canal Stockton Ca. Task: <br /> Project Manager- Jeanne Homse. Field Tech: A. Flores <br /> Client Contact: James Giottonini Phone No: 209-937-8848 <br /> Regulatory Contact: Jeff Wong „ Phone No: 209-468-0335 <br /> Approval: 1014 Completion Date: 0 7/,-'/n _ <br /> C <br /> R-C- <br /> Notify regulator 48 hours prior to site arrival. 4f, <br /> Monitor DTW/DTB all wells on site. In order:MW-1 5,6,2,3 & 4. <br /> Purge and sample all wells. <br /> Do not sample MW-4 if it has free product. Monitor skimmer. <br /> Sample for BTEX and TPHCa.Diesel. <br /> Samples to Sequoia Analytical. <br /> Monitor MW-4 with the interface robe. <br /> Contain all purge water. Drums on site. Discharge purge water into sanitary <br /> sewer manhole per permit. <br /> Bail and store free product on site. In double container. <br /> Wells are 28 feet deep. Water is at 12 feet. Wells are 2 and 4 inch diameter. <br /> Wells_will_flow around 2alg lops per minute. <br /> Prepare purchase requisition form for samples. Aj:�- <br /> AFLORESISSCANAL.dac <br />