Laserfiche WebLink
011e WORK REQUEST FORM <br /> Date of Request: 062998 Requested Completion Date: 072898 <br /> Proj Name: Stockton Smith Canal Proj No: 662 74.0002 <br /> Site Address: _ Fontana St. & Smith Canal Stockton Ca. Task: <br /> Project Manager: Jeanne H m Field Tech: A. Flores <br /> Client Contact: Jim Escobar Phone No:__ 209-944-8438 <br /> Regulatory Contact: Jeff Wong Phone No: 209-468-0335 <br /> Approval: :�'4 Completion Date: 07 2-819 & A F <br /> ER-C. <br /> Notify_regulator 48 hours-prior to site arrival SO _ <br /> Monitor DTW/DTB aIl wells on site, In order:MW-1 4. <br /> `l+ Purge and sample MW--6,2,3 and MW-4 if no product. <br /> Sample for TPHCc&Diesel. <br /> Sa=les to Sequoia Analytical. <br /> Monitor well 4 with the interface probe. <br /> Contain all purge water. Take two drums. Discharge purge water into sanitary <br /> sewer manhole per permit. <br /> Bail and store free VrQduct Qn site In double containet— <br /> Wells are 28 feet deep. Water is at 11 feet. Wells are 2 and 4,inch diameter, <br /> )Yellswill flow around all ns 12er minute, <br /> Prepare purchase roauisition_form for samples. A-F <br /> AFLOREST-WORK.doc <br />