Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request: 031798 _ Requested Completion Date: 040698 <br /> Proj Name: Stockton Smith Canal Proj No: 62574.0002 _ <br /> Site Address: Fontana St. & Smith Canal Stockton Ca. Task: <br /> Project Manager: Jeanne HQmsey Field Tech: A. Flores <br /> Client Contact: Jim Escobar Phone No: 209-944-8438 <br /> �3�S <br /> Regulatory Contact: Wevi4 ^� Phone No: 209-468-3420 <br /> Approval: Completion Date: O 4 02A 3 ArF <br /> Notify regulator 48 hours prior to site arrival. <br /> Monitor DTW/DTB all wells on site. In order:MW-5,1,2,6,3 & 4. <br /> Purge ,and sample MW-6,3 and MW-4 if no product.._ <br /> Sample for TPH@Diesel._ <br /> Samples to Sequoia Analytical. _ <br /> Monitor well 4 with the interface probe., <br /> Contain all purge water. Take two drums, Discharge purm-water into sanitary <br /> sewer manhole per permit. <br /> Bail and store free product on site. In double container. <br /> Wells are 28 feet deep. Water is at 11,feet. Wells are 2 and 4 inch diameter. <br /> Wells will flow around 2 gallons per minute. <br /> Prepare purchase requisition form for samples. AF <br /> .j <br /> AFLOREST-WORK.doc <br />