Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request: 092397 Requested Completion Date: 100197 <br /> Proj Name: Stockton Smith Canal Proj No: 62574.0002 <br /> Site Address: Fontana St. & Smith Canal Stockton Ca. Task: <br /> Project Manager: Jeanne Homsey _ Field Tech: A. Flores <br /> Client Contact: Jim Escobar Phone No: 209-944-8438 <br /> Regulatory Contact: Steve Sasson Phone No: 209-468-3459 <br /> Approval: Completion Date: K)02-9 q -Af::� <br /> 6 <br /> Notify regulator 48 hours prior to site arrival.+-�' . <br /> Monitor DTW/DTB all wells on site. In order:MW-6,5,2,1,3 & 4. <br /> ='1 Purge and sample MW-6, 3 and 4 (if no product). <br /> Sam le for TPH Diesel. <br /> Samples to Sequoia Analytical. <br /> Monitor well 4 with the interface 12robe. <br /> Contain all purge water. Take two drums. Discharge purge water into sanitary_ <br /> sewer manhole per permit, <br /> Bail and store free product on site. In double container. <br /> Wells are 28 feet deo. Water is at 12 feet. Wells are 2 and 4 inch diameter. <br /> Wells will flow around 2 gallons per minute._ <br /> Prepare purchase requisition form for samples.-A <br /> ` ' AFLORESIF-WORK.doc <br />