Laserfiche WebLink
t <br /> WORK REQUEST FORM <br /> Date of Request: 033197 Requested Completion Date: 041197 <br /> Proj Name: Stockton Smith Canal Proj No: 94-369 Phase: 01 <br /> Site Address: Fontana St. & Smith Canal Stockton Ca. Activity: 10 <br /> Project Manager:_Jeanne Homsey Field Tech: A. Flores <br /> Client Contact: Jim Escobar Phone No: 209-944-8438 <br /> Regulatory Contact: Linda Turkatte Phone No: 209-468-3441 <br /> Approval: Completion Date: 6YZJe12 7 — <br /> rzc. <br /> Notify_ regulator 48 hours prior to site arrival. <br /> Monitor DTW/DTB all wells on site. In order:MW-5,2,6,1,3 &_4.__ <br /> j Purge and sample MW-6.3 and 4 (if no product). <br /> Sample for TPH(tbDiesel. <br /> Samples to Sequoia Analytical. <br /> Monitor well 4 with the interface probe. <br /> Contain all purge water. Take two drums. Discharge purge water into sanitary <br /> sewer manhole per permit. <br /> Bail and store free product on site. In double container. <br /> Wells are 28 feet deep. Water is at 12 feet. Wells are 2 and 4 inch diameter. <br /> Wells will flow around 2alg Ions per minute. <br /> Prepare Purchase Order. <br /> AFLORES%F-WORK.doc <br />