Laserfiche WebLink
WORK REQUEST FORM <br /> 'i <br /> Date of Request: 012097 Requested Completion Date: 012297 <br /> Proj Name: Stockton Smith Canal Proj No: 94-369 Phase: 01 <br /> Site Address: Fontana St. & Smith Canal Stockton Ca. Activity: 10 <br /> Project Manager: Jeanne Homsey Field Tech: A. Flores <br /> CIient Contact: Jim Escobar Phone No: 209-944-8438 <br /> Regulatory Contact: Linda Turkatte Phone No: 209-468-3441 <br /> i <br /> Approval: In-4 Completion Date: i Z2-a7 <br /> Notify regulator 48 hours prior to site arrival. <br /> Monitor DTW/DTB all wells on site. In order:MW-6,5.1 ,2.3 & 4. <br /> Purge and sample all wells._MW-6,5,1 2,3 and 4(if no product). <br /> Sample for BTEX and TPHa-Diesel. <br /> Samples to Sequoia Analytical. <br /> Monitor well 4 with the interface probe. <br /> Contain all purge water. Take three drums. Discharge purge water into sanitar <br /> sewer manhole per permit. <br /> Bail and store free product on site. In double container. <br /> g. Wells are 28 feet deep. Water is at 12 feet. Wells are 2 and 4 inch diameter. <br /> Wells will flow around 2 gallons per minute. _ <br /> Prepare Purchase Order. Aff <br /> AFLORMF-WORK.doc <br />