Laserfiche WebLink
• GROUNDWATER SAMPLING FORM <br /> PROJECT NAME: ST'r;N snlrTy Ga-rjq_L_ WELL NO: MW- <br /> m9l"H <br /> TEC <br /> kr�or110CC rear I PROJECT NUMBER: -3 TYPE: °Monitor_Extraction Other <br /> ORDED BY: SAMPLED BY: DATE: (, 413 Q (r >d f <br /> WELL PURGING <br /> PURGE VOLUME PURGE METHOD <br /> Well sing Diamter _Bailer•Type <br /> _2-inch _4-inch _other _Pump-Type <br /> Well Total Depth RD, ft below TOC) _Other-Specify <br /> Depth to Water IWL, tt below TOG Hydrocarbon Odom: <br /> YES —NO <br /> Water Column Length <br /> No.of Wells to be Purged 3 10 Other <br /> Purge Volume Calculation(Water Cokum Lmpdr a tkAcipir a No.Vale CakL"ted Purge Voksme) <br /> X X — Calculated Purge Volume = gls <br /> {WCL} (Multipl,) (No. Vols) Actual Purge Volume = gls <br /> IYtiiitl IG "Oi�.Qpth+el`: i[3agonaAn�ar ttF'�'2gO.i7;:;4=a,66 ;6=t,5- :8 2 B ._; <br /> Groundwater Parameter Measurement: Meter Type Calibrated: Yes No <br /> TIMEIGALLONS DTW pH CONDUC TEMP TURBIDITY COMMENTS <br /> (ft) Tlvrry deg C (NTU) (COLORIODOR) <br /> deo F <br /> Cad 0 DT cv 19 ,8A 11P= 11.41 <br /> q q,,tl ^hailers C7�aLl¢{ <br /> o,,7 Bcti 1.2S�c . �F Free_ l�rv� <br /> i =(q,3)o <br /> 1�CL <br /> r'C'A c r 5 •Z_ '�2 <br />