My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009468
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FONTANA
>
2130
>
3500 - Local Oversight Program
>
PR0545053
>
ARCHIVED REPORTS_XR0009468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:52:19 AM
Creation date
12/11/2019 10:28:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009468
RECORD_ID
PR0545053
PE
3528
FACILITY_ID
FA0005720
FACILITY_NAME
SMITH CANAL PUMP STATION
STREET_NUMBER
2130
STREET_NAME
FONTANA
STREET_TYPE
DR
City
STOCKTON
Zip
95204
CURRENT_STATUS
02
SITE_LOCATION
2130 FONTANA DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"AWu�_ <br /> TABLE OF CONTENTS <br /> CONTENT PAGE <br /> two <br /> 1.0 INTRODUCTION . . . . . . . . . . . . 1 <br /> �{' 2.0 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> r , 3.0 SITE SETTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 <br /> 4.0 PROPOSED WORK - PHASE II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 4.1 Methods and Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> r ; <br /> 4.1.1 Drilling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 4.1.2 Monitoring Well Construction . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 4.1.3 Monitoring WeII Development . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> Ecr: 4.1.4 Wellhead Survey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.1.5 Fluid Level Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.1.6 Groundwater Sampling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.1.6A Hydropunch . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> - 4.1.6B Monitoring Wells . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.1.7 Groundwater Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> rs� <br /> 4.2 Project Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> r <br /> TABLES <br /> Table 1 - Soil Analysis <br /> Table 2 - Groundwater Analysis <br /> Table 3 - Free Product Removal <br /> FIGURES <br /> r <br /> Figure 1 - Site Location Map <br /> =3 Figure 2 - Site Plan <br /> Figure 3 - Well Location Map <br /> Figure 4 - Proposed Well/Boring Locations <br /> F-' Figure 5 - Well Construction Diagram <br /> Figure 6 - Project Schedule <br /> ` APPENDICES <br /> ;. <br /> Appendix I - Tank Removal and Sampling Report <br /> Appendix II - Health and Safety Plan <br /> Appendix III - RESNA's QA/QC Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.