My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FOURTH
>
337
>
3500 - Local Oversight Program
>
PR0545054
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 12:00:43 PM
Creation date
12/11/2019 11:09:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0545054
PE
3528
FACILITY_ID
FA0003939
FACILITY_NAME
BURKETT'S POOL PLASTERING INC
STREET_NUMBER
337
STREET_NAME
FOURTH
STREET_TYPE
St
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
337 FOURTH St
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> L/ n <br /> Project Lo�c/$don��izi—r( <br /> Owner lu-itI�G/ �v&CLQ JL4 e— Phone No(ZO9) f1i —711711 <br /> Contractor SEMCO Phone No. (209) 524-9653 License No. 449864 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or 1 <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12' lifts: <br /> A. Pea gravel—smooth, rounded material not more than one-half(1/2) inch in diameter <br /> B. Crushed rock—self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes trade of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of pprojecr completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. 1 - <br /> Jk ( <br /> amb (Prmt) <br /> W t) <br /> Sipature <br /> • Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.