My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FOURTH
>
337
>
3500 - Local Oversight Program
>
PR0545054
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 11:58:06 AM
Creation date
12/11/2019 11:27:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545054
PE
3528
FACILITY_ID
FA0003939
FACILITY_NAME
BURKETT'S POOL PLASTERING INC
STREET_NUMBER
337
STREET_NAME
FOURTH
STREET_TYPE
St
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
337 FOURTH St
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•Nulaid Foods in Ripon U` <br /> Subsurface Soil&Groundwater investigation <br /> i <br /> i <br /> 2.4 Safety Log <br /> A safety log shall be kept for the project work site. <br /> 2.5 Eating,Drinking,Smoking <br /> Eating,drinking,and smoking shall be allowed only in the designated areas in the support zone.No personnel <br /> may eat,drink,or smoke on site in any other area except as permitted by the SSO. <br /> 2.6 Safety Plan Acknowledgment Sheet <br /> All personnel visiting or working at the site shall read and certify to reading this SSP by appropriately <br /> completing the Safety Plan Acknowledgment Sheet(Page 9)attached to this plan. <br /> 3.0 EMERGENCY CONTINGENCY PLAN <br /> 1 Should any situation or unplanned occurrence require outside or support services, the appropriate contacts from the <br /> following list should be made: <br /> -Project Manager <br /> -Client Project Coordinator <br /> -Police/Sheriffs Department <br /> -Ambulance <br /> -Hospital <br /> 3.1 Emergency Conditions <br /> In the event an emergency develops on-site,the procedures delineated herein are to be immediately followed. <br /> Ii Emergency conditions are considered to exist if <br /> - Any member of the project is involved in an accident or experiences any adverse effects of <br /> symptoms of exposure while on site. <br /> - A condition is discovered that suggests the existence of a situation more hazardous than <br /> 3 anticipated. <br /> i 3.2 Emergency Procedures <br /> Il In the event of an emergency, the following emergency procedures should be followed. Personnel on site <br /> should use the "buddy" system (pairs). Buddies should prearrange hand signals or other mean of <br /> communication.In emergencies the following hand signals are suggested: <br /> - Hand gripping throat:out of air,can't breathe. <br /> Grip partner's wrist or place both hands around waist:leave area immediately,no debate! <br /> Hands on top of head: need assistance. <br /> - Thumbs up:OK,I'm all right,I understand. <br /> Thumbs down: No,negative. <br /> ' Site work areas entrance and exit routes will be planned and emergency escape routes delineated by the <br /> Project Manager.These routes will be shown to all on-site personnel by the SSO. <br /> Visual contact will be maintained between"pairs"on site with the team remaining in close proximity in order <br /> to assist each other in case of emergencies. <br /> 1 In the event that any member of the field crew experiences any adverse effects or symptom of exposure while <br /> on-site,the entire field crew should immediately halt work and act according to the instructions provided by <br /> 1 the PSO. <br /> Wind indicators visible to all on-site personnel will be provided by the Project Manager to indicate possible <br /> 1 routes for upwind escape. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.