Laserfiche WebLink
KLEINFELDER <br /> 1 INTRODUCTION <br /> Mr. Carl Ryalls of California Nuggets, Inc. contacted Kleinfelder requesting the preparation and <br /> implementation of a workplan for the installation of a groundwater monitoring well network for <br /> the existing wastewater storage ponds and spray application fields and assessing the vadose zone <br /> located at the facility in Ripon, San Joaquin County, California. The baseline assessment is <br /> being implemented in preparation of a Report of Waste Discharge (ROWD). The ROWD <br /> process has been initiated by California Nuggets, Inc. as a voluntary gesture to remain in <br /> compliance with State law. A workplan is generally required to address Waste Discharge <br /> Requirement (WDR) set forth by the Regional Water Quality Control Board (RWQCB). This <br /> usually includes a baseline groundwater study including background/upgradient and <br /> downgradient quality at a site including evaluation of potential discharge limits. <br /> Kleinfelder is committed to providing quality service to our clients, commensurate with their <br /> needs and desired level of risk. If a portion of this workplan does not meet your needs or if those <br /> needs have changed, Kleinfelder will consider appropriate modifications, subject to the standards <br /> of care to which we adhere as professionals. Modifications such as changes in scope, <br /> methodology, scheduling, and contract terms and conditions may result in changes to the risks <br /> assumed by you our client, as well as adjustments to our fees. We look forward to the <br /> opportunity to serve you. <br /> This workplan is subject to the limitations presented in Chapter 7. Any other party (other than <br /> California Nuggets, Inc. or regulatory agencies having enforcement jurisdiction for the site) who <br /> would like to use this document shall notify Kleinfelder, Inc. of such intended use by requesting <br /> permission in writing. <br /> 50890.E01/ST05&358/JDZ:Iv Page I of 12 <br /> ©2005,Kleinfelder,Inc. April 29,2005 <br />