My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 9:11:56 AM
Creation date
12/12/2019 8:40:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 404 WEST FREMONT STREET <br /> WKA No. 1628.09 <br /> August 31 , 2001 <br /> Page 15 <br /> sparging system will be continuously operating and displacing petroleum hydrocarbons into the <br /> vadose and unsaturated zones. Groundwater mounding near the sparging wells will be monitored <br /> to optimize the on-off duty cycle of the well for mass transport enhancement and reduction of <br /> - energy and off-gas treatment costs. <br /> Security/Safety Measures <br /> A locked six-foot-high chain-link fence fitted with privacy slates will secure the air sparging/SVES <br /> at the subject site. Additional safety measures will include the use of "No Smoking" signs and "Do <br /> Not Enter" signs posted on all sides of the treatment enclosure, a mounted fire extinguisher, and an <br /> k" emergency 24-hour telephone number posted on the fence. <br /> Construction Activities and Remediation Systems Operation Time Line <br /> 1 The following are estimated time lines for construction activities and system operations subsequent <br /> to permit approvals: <br /> 1 <br /> Air sparging and soil vapor extraction well installation week 1 <br /> Trenching and subsurface pipe installation week 2 — 3 <br /> Construction of treatment enclosure week 3 — 4 <br /> Installation of remediation equipment week 4 <br /> �- Compliance source tests and verification reports weeks 5 — 7 <br /> System operation Weeks 7 - 9 <br /> Quarterly Groundwater Monitoring and Sampling <br /> J <br /> Monitoring and sampling of groundwater beneath the site will continue to be performed on a <br /> quarterly basis. Quarterly monitoring and sampling reports will be prepared subsequent to <br /> the monitoring and sampling events and will include results of laboratory analysis, <br /> groundwater elevation data, flow direction and the estimated hydraulic gradient beneath the <br /> site. <br /> it <br /> I <br /> �:.•- .r.,i f it---= � As.'�UOCJAI'6�; INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.