My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009406
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
ARCHIVED REPORTS_XR0009406
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 10:08:55 AM
Creation date
12/12/2019 9:30:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009406
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> CRYSTAL CREAMERY STOCKTON <br /> WKA No. 1628.10 <br /> August 20, 2003 <br /> Page 2 <br /> gasoline(TPHg),Benzene, Toluene, Ethylbenzene and Total Xylenes (BTEX), Tert-Butanol, <br /> Methyl tert-Butyl Ether, Di-isopropyl Ether, Ethyl tert-Butyl Ether, and Tert-Amyl methyl Ether <br /> (oxygenates)using EPA Method 8260B. <br /> The submersible pump was cleaned with a solution of Liqui-noxg and water before purging each <br /> well to minimize the potential for cross-contamination. In addition,the wells were sampled in <br /> order of increasing concentration based on previous sampling results. Well purging data sheets <br /> are included in Appendix A. All water removed during sampling and purging operations was <br /> sealed in labeled 55-gallon drums and stored on site. <br /> Ozone Injection System Operation <br /> An ozone injection system and ten injection wells were installed at the site during the third <br /> quarter of 2002 (see Plate 2). Operation of the system commenced on July 18, 2002. Ozone <br /> injection was intennittent during the remainder of the third quarter of 2002 as bugs were worked <br /> out of the system. The system has been operating on a nearly continuous basis, however, <br /> through the second quarter of 2003. <br /> r <br /> Findings <br /> Depth-to-groundwater measurements at the site ranged from 15.75 to 16.40 feet below top of <br /> casing during the June 4, 2003 monitoring event. The calculated groundwater flow direction for <br /> the monitoring event was toward the northeast(see Plate 2)with a hydraulic gradient of 0.005. <br /> Cumulative groundwater elevation data is summarized in Table 1. Time plots of groundwater <br /> elevations (and TPH gasoline concentrations)for wells MWl, MW4, and MW5 are presented in <br /> Charts 1,2, and 3, respectively. <br /> With only minor exceptions,none of the target analytes were detected in samples from wells <br /> MW1, MW2, MW3, MW6, MW7, and MW8 during the second quarter of 2003. Wells MW4 <br /> and MW5 continued to show elevated concentrations of BTEX compounds and TPH as gasoline. <br /> Cumulative analytical results are summarized in Table 2. Time plots of TPH gasoline <br /> concentrations (and groundwater elevations) for wells MWl, MW4, and MW5 are presented in <br /> Charts 1, 2, and 3,respectively. Laboratory analytical reports and Chain-of-Custody <br /> documentation are included in Appendix B. <br /> .r <br /> NNW <br /> V <br /> WALLACE-KUHL <br /> w,,, &ASSOCIATES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.