My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009407
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
404
>
3500 - Local Oversight Program
>
PR0545067
>
ARCHIVED REPORTS_XR0009407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 10:32:38 AM
Creation date
12/12/2019 9:31:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009407
RECORD_ID
PR0545067
PE
3526
FACILITY_ID
FA0005019
FACILITY_NAME
BANNER ISLAND BALLPARK
STREET_NUMBER
404
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13741017
CURRENT_STATUS
02
SITE_LOCATION
404 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRYSTAL CREAMERY STOCKTON <br /> WKA No. 1628.10 <br /> April 30, 2003 <br /> Page 2 <br /> �1 <br /> gasoline(TPHg),Benzene, Toluene, Ethylbenzene and Total Xylenes (BTEX), Tert-Butanol, <br /> Methyl tert-Butyl Ether, Di-isopropyl Ether, Ethyl tent-Butyl Ether, and Tert Amyl methyl Ether <br /> (oxygenates) using EPA Method 826013. <br /> The submersible pump was cleaned with a solution of Liqui-nox® and water before purging each <br /> well to minimize the potential for cross-contamination. In addition, the wells were sampled in <br /> order of increasing concentration based on previous sampling results. Well purging data sheets <br /> are included in Appendix A. All water removed during sampling and purging operations was <br /> sealed in labeled 55-gallon drums and stored on site. <br /> Ozone Injection System Operation <br /> bw An ozone injection system and ten injection wells were installed at the site during the third <br /> quarter of 2002 (see Plate 2). Operation of the system commenced on July 18, 2002. Ozone <br /> injection was intermittent during the remainder of the third quarter as bugs were worked out of <br /> 60 <br /> the system. The system has been operating on a nearly continuous basis,however,through the <br /> fourth quarter of 2002 and the first quarter of 2003. <br /> �1 <br /> Findings <br /> r. Depth-to-groundwater measurements at the site ranged from 15.89 to 16.58 feet below top of <br /> casing during the March 21, 2003 monitoring event. The calculated groundwater flow direction <br /> for the monitoring event was toward the northeast (see Plate 3) with a hydraulic gradient of <br /> 0.007. Cumulative groundwater elevation data is summarized in Table 1. Time plots of <br /> groundwater elevations (and TPH gasoline concentrations) for wells MW I, MW4, and MW5 are <br /> presented in Charts 1, 2, and 3,respectively. <br /> With only minor exceptions,none of the target analytes were detected in samples from wells <br /> Yui <br /> MW1,MW2,MW3, MW6, MW7, and MW8 during the first quarter of 2003. Wells MW4 and <br /> MW5 continued to show elevated concentrations of BTEX compounds and TPH as gasoline. <br /> Cumulative analytical results are summarized in Table 2. Time plots of TPH gasoline <br /> concentrations(and groundwater elevations) for wells MWl, MW4, and MW5 are presented in <br /> Charts 1,2, and 3,respectively. Laboratory analytical reports and Chain-of-Custody <br /> documentation are included in Appendix B. <br /> Y�1 <br /> y WALLACE•KUHL <br /> &ASSOCIATES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.