Laserfiche WebLink
I{ <br /> Now <br /> h <br /> Sidewalk <br /> Sidewalk <br /> I <br /> Storm Drain <br /> West Fremont Street Tree <br /> Utility �High voltage line — - <br /> -I— — — — -- — — — — — _pole — — — — — — <br /> Sidewalk a Sidewalk <br /> Water <br /> GWE -10 23 I I 0 <br /> Amencaa Protective meter <br /> \ \ \ �f i' _Ser ces building v <br /> \=k W5 endo% I <br /> \ ___ M <br /> 90 <br /> — <br /> �` 9190 �� <br /> — _ ` II Former <br /> ` — d,spensen9 EY <br /> � \ island <br /> .9"0 <br /> "0 �G-7% 76 \ `\ `� I l t9 = Ground water monitoring well <br /> �(`pavemewt` • \ \ \ MW3�4 = Proposed ground water <br /> \ ! ♦1 I GWE -1000 monitoring well <br /> GQncre \\ \ G � g g`1e� , Manhole <br /> GWE = Ground water elevation <br /> g cover Chose <br /> 60, Storm,branNorm Chevrolet —�= Ground water flow direction <br /> ct+on <br /> Dim --- Property August 15 1446 <br /> N. <br /> `� I Overhead <br /> 9 ` <br /> Excovo on i" - 1 \ utility <br /> `TO\ \ \\ \\ Bound a 4^ - - J 4 I I I ;lines <br /> \ \ 4�qq��,,opy overh�g - - l �1 NOTE <br /> 17`clearance 1 <br /> I \` Co r4 L. <br /> ahng Daclt I I�, t;Mw�67 1 Site Plan adapted from field drawing <br /> N I I <br /> \ I\ ` For <br /> 6mer II II , ` 2 Well locations and elevations surveyed <br /> GWE-936 Storm 10000 A/C by Siegfried Engineering <br /> ' underground I I pavement <br /> Drain Fuel tank <br /> III <br /> {I <br /> Crystal Creamery <br /> Warehouse <br /> Lolity <br /> U pole <br /> 0 20 40 <br /> SMW ' Scale in Feet <br /> GWE UNDETERM+NED <br /> i' GROUND WATER ELEVATION PLAN WKA NO 1628 08 <br /> Drawn By HLA <br /> 404 WEST FREMONT STREET DATE 11188 <br /> WALLACE • KUHL & ASSUCIAIES, INC Checked By KMB PLATE NO 2 <br /> GEOTECHNICAL ENGINEERING Stockton, California <br /> GEOLOGIC & ENVIRONMENT#L SERVICES <br /> I <br />