Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> MS-90-129 <br /> PAGE TWO <br /> b. Connection to an approved public water supply system is <br /> required. <br /> 1. Test well will be required to meet the following <br /> (a) Water quality tested to meet Title 22 , CCR (Safe <br /> Drinking Water Act) , requirements. <br /> (b) Water quantity tested to show an adequate source. <br /> (c) Results approved by the Environmental Health <br /> Division and County Public Works prior to final <br /> approval of improvement plans. <br /> 2 . A letter from the water supplier will be required stating <br /> that they have the capacity to serve the development and <br /> that the system meets State standards prior to recording <br /> the final map. <br />