Laserfiche WebLink
r <br /> CONDITIONS OF APPROVAL <br /> LODI NUT COMPANY <br /> MS-90-119 <br /> Unless otherwise specified, all Conditions of Approval shall be <br /> complied with prior to the approval of the Parcel Map. <br /> 1. DEPARTMENT OF PUBLIC WORKS <br /> Conditions of Approval: <br /> a. The Drainage Pond shall be relocated to the developed <br /> parcel. <br /> b. Dedication to result in a 25-foot wide right-of-way from the <br /> centerline of Atkins Road to the property line shall be <br /> required across the frontage of APN 019-200-15. <br /> ORDINANCE REQUIREMENTS: <br /> The Ordinance Requirements listed below have been identified as <br /> pertinent to this project. Other Ordinance Requirements may also <br /> apply. Ordinance Requirements are not appealable. <br /> C. A Parcel Map is required. <br /> d. The access for Parcels #2 and #3 shall be part of each <br /> parcel (Flag Lots) instead of easements through Parcels #1 <br /> and #4. <br /> e. The Traffic Impact Mitigation Fee will be required for this <br /> subdivision. The fee is due and payable at the time of the <br /> building permit application. (The fee varies based on the <br /> land use type. The fee shall be automatically adjusted <br /> annually by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> 2. PUBLIC HEALTH SERVICES <br /> Conditions of Approval: <br /> a. Relocate the existing wastewater ponds onto Parcel #4 prior <br /> to recordation of the map. <br /> 3. PACIFIC GAS AND ELECTRIC COMPANY <br /> Conditions of Approval: <br /> a. The fifty (50) foot wide road access easement shall be <br /> dedicated as a Public Utility Easement. <br />