Laserfiche WebLink
'. 20 October 2003 <br /> AGE-NC Project No 95-0167 <br /> 1 Page 4 of 4 <br />' Preparation of a Corrective Action Plan (CAP) The CAP should include a discussion and <br /> recommendation of remediation options for the site (e g in-situ air or ozone sparging, soil <br /> vapor extraction, ground water extraction, or monitored natural attenuation) <br /> 1 6.0 LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> 1 environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologlc <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br /> 1 available data points(i e monitoring wells and ground water),and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or implied,is made as to the professional <br /> interpretations, opinions and recommendations contained in this report <br /> 1 <br /> 1 <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 Advanced GeoEnvvonmental,Inc <br /> 1 <br />