Laserfiche WebLink
1 <br /> 10 February 2003 <br /> AGE-NC Project No 95-0167 <br /> ' Page 4 of 4 <br /> • Preparation of a Corrective Action flan (CAP) <br /> The CAP should Include a discussion and <br /> ozone <br /> recommendationof remediation options for the s ito ed natural air or at on) <br /> vapor extraction, ground watersparging, soil <br /> .extraction, or mo <br />, 1 <br /> 6.0. LIMITATIONS <br /> skill <br /> ily exercised <br /> Our professional services were performed using that d ila r localit es ee of care <br /> The and <br /> ndinlgs were based mainly <br /> by environmental consultants practicing in this or sim <br /> upon analytical results provided by an Independent a arery madefrom ons a limited number gol <br /> conditions at the site for the purpose of this investigation <br /> available data points(i c monitoring wells and ground water), and subsurface conditions may vary <br /> away from these data points No other warranty,expressed or implied,is made as to the professional <br /> interpretations, opinions and recommendations contained in this report <br /> 1 <br /> , <br /> V <br /> S <br /> k <br /> 6 <br /> t Advanced GeoEnvironmentaf,Inc <br /> i[ <br />