Laserfiche WebLink
1 <br /> 25 August 2004 <br /> . AGE-NC Project No 95-0167 <br />' Page 4 of 4 <br />' 5.0. RECOMMENDATIONS <br /> Based on present site conditions, AGE recommends continued quarterly ground water monitoring <br /> at the site The next monitoring will be scheduled for September 2004 <br /> As required by the EHD by letters dated 21 June and 03 August 2004, AGE has prepared and <br />' submitted Additional Site Assessment Work Plan dated 13 August 2004, which included the <br /> installation of two additional ground water monitoring wells and a cone penetration test (CPT) <br /> boring for the delineation of vertical and lateral ground water contamination at the site The EHD <br />' has approved the work plan with conditions in a letter dated 18 August 2004 <br />' 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br />' environmental consultants practicing in this or similar localities The findings were based mainly <br /> upon analytical results provided by an independent laboratory Evaluations of the hydrogeologic <br /> conditions at the site for the purpose of this investigation are made from a limited number of <br />' 0 available data points (i e monitoring wells and ground water samples), and subsurface conditions <br /> may vary away from these data points No other warranty, expressed or implied, is made as to the <br />' professional interpretations, opinions and recommendations contained in this report <br /> 1 <br /> • <br />' Advanced GeoEnvironmental,inc <br />