Each ground monitoring well was completed with 20 feet of well screen section The wells were <br /> constructed using two 2-Inch diameter, schedule 40 PVC casing with the following designs and <br /> material Monitoring well MW-1 was completed with 0 02-inch slotted screen, the screen Interval <br /> was Installed from depths of 15 to 35 feet bsg A filter pack was installed using #3 Lonestar sand <br /> from 13 to 35 feet bsg Bentonite chips were used to make a one-foot transition seal above the sand <br />' pack Monitoring wells MW-2 through MW-4 were completed with 0 02-inch slotted screen, the <br /> screen interval was installed from depths of 10 to 30 feet bsg A filter pack was installed using#3 <br /> Lonestar sand from 9 to 30 feet bsg Bentonite chips were used to make a one-foot transition seal <br />' above the sand pack The remaining annular space was backfilled to within six inches of surface <br /> grade with portland cement A traffic-rated well box(8-Inch diameter)was Installed over each well, <br />' in accordance with County regulations <br /> • TPH-g was detected in one of the twelve soil samples analyzed(MW 1-15)at a concentration <br />' of 990 milligrams per kilogram (mg/kg) BTEX compounds were also detected in the same <br /> soil sample at concentrations of 3 9 mg/kg, 33 mg/kg, 17 mg/kg and 110 mg/kg, <br /> respectively BTEX compounds were also detected In two other soil samples collected from <br />' bonng MW-1 Toluene,ethyl benzene and total xylene were detected in sample MW 1-30 at <br /> concentrations of 0 012 mg/kg, 0 005 mg/kg and 0 028 mg/kg, respectively BTEX <br /> compounds were detected in sample MW1-35 at concentrations of 0 008 mg/kg, 0 024 <br />' mg/kg, 0 007 mg/kg and 0 037 mg/kg, respectively Soil samples collected from the other <br /> soil borings(MW-2 through MW-4)did not contain detectable concentrations of petroleum <br /> hydrocarbons The oxygenated compound MTBE was not detected in the soil samples <br />, . analyzed <br />' On 06 November 2000,two groundwater wells were installed off-site Soil bonng/monitonng wells <br /> MW-5 and MW-6 were advanced at the site as part of assessment activities related to the former <br /> USTs at the site Soil borings MW-5 and MW-6 were advanced vertically to depths of 25 bsg Soil <br />' borings MW-5 and MW-6 were completed as ground water monitoring wells utilizing 2-inch <br /> diameter, schedule 40, blank polyvinylchloride (PVC)well casing from 10 feet to 25 feet bsg and <br /> perforated, 2-inch diameter PVC well casing (0 020-Inch slot) from 10 feet bsg to surface A filter <br />' pack was installed using#3 Lonestar sand from 8 feet to 25 feet bsg Bentonite chips were used to <br /> make a one-foot transition seal above the sand pack The remaining annular space was backfilled to <br /> within six inches of surface grade with portland cement A traffic-rated well box (8-Inch diameter) <br />' was installed over each well, in accordance with County regulations <br /> • TPH-g, BTEX compounds and MTBE were not detected in the soil samples analyzed <br /> On 14 November 2000, three soil probe borings (P9 through P11)were advanced at the site,under <br />' observation by the EHD Probe borings were advanced in the area of the former USTs and in the <br /> areas north and east of the former UST dispenser Bonng P9 was advanced to a depth of 35 feet <br /> below surface grade (bsg), boring P10 was advanced to a depth of 40 feet bsg and boring P11 was <br />' advanced for collection of a grab ground water sample to 20 feet bsg <br /> Advanced GeoEnvironmental,Inc <br />