Laserfiche WebLink
. I <br /> Papp•3-6 <br /> SITE PREPARATION AND SYSTEM DATA <br /> CHECK TANK SYSTEM SIZE 1 - TANK W 2 - TANK = 3 TANK�1� /, <br /> CUSTOMER: DATE: 7 —,227-2✓ <br /> LOCATION NO.: Cmc y �cnl/�L-� SYSTEM NO.: ) / <br /> CITY/STATE: PRODUCT: <br /> SITE PREPARATION <br /> 4 <br /> OTHER CONDITIONS 13 L <br /> 9 <br /> 1090 <br /> VAPOR RECOVERY ❑ PLUGS RISERS ❑ OTHER <br /> VENT NO PREPARATION ❑ OPEN TO ATMOSPHERE ❑ P-V VALUE REMOVED OTHER <br /> REMOTE/SUBMERSIBLE (DEPTH I ❑ SUCTION (HEIGHT ) <br /> CHECK VALVE STRAINER IMPACT VALVE CHECK VALVE STRAINER SUCTION CONNECTION <br /> ❑REMOVED&OPEN ❑REMOVED CLOSED 1-1 BURIED 1:1 REMOVED ❑UNION <br /> PLUG-IN <br /> I IN PLACE �` IN PLACE ❑CLOS OUT ❑EXTRACTABLE ❑IN PLACE ❑COUPLING <br /> UG <br /> El CLOSED ❑REEMOVED PLACED&COVER ❑OPEN ❑REMOVED ❑REPLACED&COVER ❑OPEN WITH FOIL <br /> REPLACEDREMOVED&COVER ❑OTHER DIN PLACE ❑OTHER ❑OPEN NO FOIL <br /> ❑REMOVED& <br /> ❑OTHER CAP REPLACED ElIN PLACE <br /> ❑OTHER ❑OTHER <br /> TEST 1 DATA <br /> TANK 1 TANK 2 TANK 3 <br /> LOCATION DROP TUBE LOCATION DROP TUBE LOCATION DROP TUBE <br /> FILL Gauge Other(Specify) IN OUT None FILL Gauge Other(SPedfy) IN OUT Nona FILL Gauge Other(SPeclfy) IN OUT None <br /> T.PROBE <br /> BALANCE 'C <br /> CALIBRATION <br /> LEVELS LOCATION 77METHOD <br /> SOLID ROD ❑ LIQUID <br /> Time Tank 1 Tank 2 Tank 3 1 2 3 4 5 6 AVERAGE <br /> START 7 CC'S <br /> END '"7� A DIVISION <br /> AVG.CC'S/DIV. �-II <br /> LEAK RATE (LR)CALCULATION <br /> LR = ±� DIVISIONS X CALIBRATION, CC = CC IN OUT <br /> AMINUTE DIVISION MINUTE <br /> LR = 1 � <br /> / TEMPERATURE COMPENSATION [TC)CALCULATION <br /> COEFFICIENT OF EXPANSION 1/-F , TC = 3785 GT CE "�'F CC IN OUT <br /> GRAVITY TEMPERATURE,.F - OR <br /> TIME MINUTE <br /> SOURCE ❑T159C <br /> 0 0 ❑ CHART <br /> ❑ B ❑ E ❑ PUBLISHED DATA AT 60OF <br /> ❑ C ❑ OTHER TC = <br /> TANK 1 TANK 2 TANK 3 <br /> SYSTEM CAPACITY, wi GT TANK 1 TANK 2 TANK 3 TOTAL <br /> GALLONS <br /> nF Q.F TC- <br /> t Temp. Differential <br /> T Time of Temp. <br /> Differential, Min. yyy <br /> I< OTime <br /> ABSOLUTE LEAK RATE(ALR)CALCULATION <br /> ABSOLUTE LEAK RATE <br /> LEAK RATE TEMP.COMPENSATION CC/MIN <br /> x 0.015852 • _ -+1 Orel <br /> CC/MIN GAL/HOUR <br /> ❑ IF ALR> ± 0.05 GPH,A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS(CALCULATIONS ON CHART) <br /> ❑ A CHECK TEST WAS NOT CONDUCTED. <br /> ' 60 MINUTES/HOUR - 3785 CC/GALLON =0.015852 <br />