Laserfiche WebLink
Pop*3-5 <br /> SITE PREPARATION AND SYSTEM DATA <br /> CHECK TANK (S�YSST/EM SIZE 1 - TANK 2 - TANK = 3 - TANK <br /> CUSTOMER: 5 I GL�L- DATE: <br /> LOCATION NO.: SYSTEM NO.: <br /> CITY/STATE: CL51— PRODUCT: UK— <br /> SITE PREPARATION <br /> OTHER CONDITIONS <br /> VAPOR RECOVERY L']I PLUGS ❑ RISERS ❑ OTHER <br /> VENT NO PREPARATION ❑ OPEN TO ATMOSPHERE ❑ P-V VALUE REMOVED ❑ OTHER <br /> E REMOTE/SUBMERSIBLE (DEPTH 1 ❑ SUCTION (HEIGHT 1 <br /> CHECK VALVE STRAINER IMPACT VALVE CHECK VALVE STRAINER SUCTION CONNECTION <br /> [:IREMOVED&OPEN 0REMOVED §6 CLOSED ❑BURIED ❑REMOVED ❑UNION <br /> IN PLACECAIN PLACE ❑CLOSED OUT ❑EXTRACTABLE E]IN PLACE ❑COUPLING <br /> ❑CLOSED ❑REMOVE O&COVER 1:1 OPEN ❑REMOVED E]REPLACED& COVER❑ OPEN WITH FOIL <br /> ❑RREMOVED EPLACED&COVER ❑OTHER ❑IN PLACE ❑OTHER ❑OPEN NO FOIL <br /> ❑REMOVED& <br /> ❑OTNER CAP REPLACED ElIN PLACE <br /> ❑OTHER ❑OTHER <br /> TEST 1 DATA <br /> TANK 1 TANK 2 TANK 3 <br /> LOCATION DROP TUBE LOCATION DROP TUBE LOCATION DROP TUBE <br /> FILL Gauge Other(Specify) IN OUT None FILL Gauge Other(Specify) IN OUT Nonit FILL Gauge Other(Specify) IN OUT None <br /> T.PROBE <br /> BALANCE <br /> CALIBRATION <br /> LEVELS LOCATION / r / METHOD SOLID ROD ❑ LIQUID <br /> Time Tank 1 Tank 2 Tank 3 1 2 3 4 5 6 AVERAGE <br /> START ` CC'S r-- <br /> END DIVISION '-Y <br /> AVG.CC'S/DIV. <br /> LEAK RATE ILR)CALCULATION <br /> LR = ±0 DIVISIONS X CALIBRATION, CC = CC IN OUT <br /> AMINUTE DIVISION MINUTE <br /> L R= �-S, 66?" <br /> TEMPERATURE COMPENSATION(TC)CALCULATION <br /> COEFFICIENT OF EXPANSION 1/•FTC 3785 GT CE 0•F CC IN OUT <br /> = <br /> GRAVITY TEMPERATURE, F - OR <br /> TIME MINUTE I•) I-) <br /> SOURCE 0T159C <br /> ❑ A ❑ D ❑ CHART <br /> ❑ B ❑ E ❑ PUBLISHED DATA AT 60OF <br /> ❑ C ❑ OTHER TC = <br /> TANK 1 TANK 2 TANK J <br /> SYSTEM CAPACITY, GT TANK 1 TANK 2 TANK 3 TOTAL <br /> GALLONS <br /> F <br /> •F TC = <br /> ±Temp. Differential <br /> T Time of Tamp. <br /> 0 Time <br /> Differential, Min. <br /> ABSOLUTE LEAk RATE(ALR))CALCULATION <br /> ABSOLUTE LEAK RATE _ E K RATETEMP./OM�PENSATION 7CIMIN <br /> = X 0.015852 • _ -4 /� <br /> CC/MIN GAL/HOUR <br /> ❑ IF ALR> ± 0.05 GPH,A CHECK TEST WAS CONDUCTED WHICH CONFIRMS THE ABOVE RESULTS(CALCULATIONS ON CHART) <br /> ❑ A CHECK TEST WAS NOT CONDUCTED. <br /> • 60 MINUTES/HOUR 3785 CC/GALLON=0.015852 <br />