Laserfiche WebLink
SITE PREPARATION AND SYSTEM DATA Page 5 <br /> u THREE-TANK SYSTEM <br /> CUSTOMER: 7/�L L DATE: <br /> / ) <br /> LOCATION NO.: Z `l" �/S 2 E� / SYSTEM NO.: <br /> CITY/STATE: 57acKTcllu PRODUCT: /�- <br /> SITE PREPARATION <br /> OTHER CONDITIONS <br /> VAPOR RECOVERY ❑ PLUGS LT RISERS p OTHER <br /> VENT <br /> ❑ NO PREPARATION OPEN TO ATMOSPHERE ElP-V VALUE REMOVED ElOTHER <br /> Ei REMOTE/SUBMERSIBLE (DEPTH I ❑ SUCTION (HEIGHT ) <br /> CHECK VALVE STRAINER IMPACT VALVE CHECK VALVE STRAINER SUCTI CONNECTION <br /> ❑REMOVED&OPEN ❑REMOVED ❑CLOSED ❑LEIE <br /> IED [:]REMOVED ❑UNION <br /> PLACE LSV PLACE (❑� <br /> ]CLOSED <br /> OUT RACTABLE ❑IN PLACE ❑COUPLING <br /> El CLOSED ❑REPLACED REMOVED &COVER E&6PEN OVED ❑RE VIED&COVER ❑OPEN WITH FOIL <br /> LACEDREPLACEDREMOVED&COVER ❑OTHER LACE OTHER ❑OPEN NO FOIL <br /> REMOVE <br /> ❑OTHER REPLD & D ❑IN PLACE <br /> ❑OTHER <br /> TEST 1 DATA <br /> TANK 1 TANK 2 TANK 3 <br /> LOCATION DROP TUBE LOCATION DROP TUBE LOCATI DROP TUBE <br /> FILL Gauge Other(Specify) IN OUT None FILL Gauge other(Specify) IN OUT No Gauge Other(Specify) IN OUT None <br /> T.PROBE <br /> BALANCE <br /> CALIBRATION <br /> LEVELS LOCATION METHOD <br /> LAS SOLID ROD ❑ LIQUID <br /> Time Tank 1 Tank 2 Zal.k 3 1 2 3 4 5 6 AVERAGE <br /> START��� CC'S .t <br /> END 0 DIVISION <br /> AVG.CC'S/DIV, yi ✓Y7 <br /> LEAK RATE (LR) AL ULA N <br /> LR= ±� DIVISIONS X CALIBRATION, CC = CC IN OUT <br /> OMINUTE DIVISION MINUTE <br /> LR= f -7 % <br /> TEMPERATURE COMPENSATION ITC)CALCULATION <br /> COEFFICIENT OF EXPANSION 1/.F o 3785GT CE A*F CC IN OUT <br /> GRAVITY _ TEMPERATURE, F TC- = OR <br /> SOURCE ❑T159C 0 TIME MINUTE <br /> ❑ A ❑ D ❑ CHART <br /> ❑ B ❑ E ❑ PUBLISHED DATA AT 60OF <br /> ❑ C ❑ OTHER TC <br /> TANK I TANK 2 <br /> SYSTEM CAPACITY,GALLONS /06)00 GT TANK 1 TANK 2 TANK 1 L <br /> Temp. Differential 065 SOF TC= <br /> T Time of Temp. /1 O <br /> Differential, Min. fj ATime <br /> ABSOLUTE LEAK RATE(ALR)CALCULATION <br /> ABSOLUTE LEAK RATE = 7~, — Z, / <br /> LEAK RATE TEMP.COMPENSATION CC/MIN <br /> x 0.015852 <br /> CC/MIN GAL/HOUR <br /> ❑ IF ALR> ± 0.05 GPH,A CHECK TEST WAS CONDUCTED WHICH CCENFIRMS THE ABOVE RESULTS(CALCULATIONS ON CHART) <br /> ❑ A CHECK TEST WAS NOT CONDUCTED. <br /> + '60 MINUTES/HOUR - 3785 CC/GALLON=0.015852 <br />