My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_1987 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 1:51:08 PM
Creation date
12/16/2019 11:48:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2001
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND TANK TNSPECTION RECORD <br /> NEW TANK INSTAL.L.ATION <br /> SITE NAME INSPECTOR'S NAME <br /> ADDRESSGam / e! rU�% C. L�L7J CIT n -'._) ZIP <br /> CONTRACTOR: NAME (��? ['�� yQ"� TELEPHONE <br /> OWNER: NAME TELEPHONE <br /> DIS- INSPECTOR'S <br /> DATE APPROVED APPROVED INITIALS rr <br /> ) ' TEl OR EQUIPMENT INSPECTED <br /> I pa id <br /> t <br /> tl = <br /> IN_IT IA1. INSPECTION <br /> 1. Tank tested upon delivery IH.lid. ;Iasteel) or air at SPSI (FRP)) <br /> 2. Visual inspection of secondary containment. <br /> 3. Tank appropriatel laced with approved backfill. <br /> 4 UL numbers and tank capacities recorded. <br /> v)F`a O✓ ''-"�PING STAGE INSPECTION <br /> ' 1. Pressu test of a>in lPrimar and Sccondar (NFPA 3O)1 <br /> 2. Ball float valves installed. <br /> 3. Overfill protection installed. descriltc: <br /> 4. Unt:sed tank openings scaled and cathodically protected. r, <br /> 5. Visual ins eclton of secondary containeent on piping. <br /> (Ixkebt• veet Mr prop <br /> n (n a e and btuu ht to rade. ewers) <br /> 7. Fill and vent piping brought to grade. <br /> B. Product line leak detector in Place. (Hard wired) <br /> 9. Approved tank leak monitoring device installed. <br /> 10. All galvanized piping and fittings properly wrapped. <br /> 11. Pressure decay test on com 1CLe Lank and product delivery s sLemV <br /> I FINAL. It:SPF.CTION <br /> c E <br /> Precision Lest successiull i.Imnleted ar.d hard i..ales received.g79S <br /> 7. Spill protectinii at fill r .r. <br /> 3. Performance test of m•4-rf111 lit p or ion r.vsteo. _ <br /> 4. Prrfj.rmaoce toll of rtodur, line rc.rk dcrectot. (Hard wired) <br /> N1�?rd <br /> 5. Performance te:;t of continuous r.mrt utrt s• srrm(s) on tank(:)M rr <br /> 6. Petalt to o aerate appjjcakj,.0 (om,Icte. <br /> 7. Acceptable recordkeeping s stew. <br />
The URL can be used to link to this page
Your browser does not support the video tag.