Laserfiche WebLink
W <br /> ( ) Before being 00rersdk enclosed" or placed in use, all <br /> underground storage tanks and PIP149 shall be tested <br /> for tightness hydrostatically or with air pressure at <br /> Not 1086 thsm 3 POVA46Par square-inch (20.6 k Fa) and <br /> not were than S pounds par <br /> Pressure pi1 0 d t q 11(34.48 <br /> ested to 150 <br /> 0rgnt a® " axi anti i ate pressure of the <br /> system' P pn 1a at eall1' ta0tad to 110 percent of the <br /> ai u 'an iei ated pressure of the system, but not <br /> less than ouads Per square inch (34.4 s) gouge at ®� <br /> the highest point of the s sten® <br /> Y This teat shall be <br /> attained for a sufficient tin* to complete visual <br /> .{. , ;... <br /> Inspection91" all Jointa and con cations, but for at <br /> least 10 minutes In lieu of the above, a test using <br /> accepted engineering practices shall be used. Some <br /> acceptable test methods for testing pipelines are <br /> Provided in Appendix I of this subchapter. <br /> Double- <br /> walled underground storage tanks are exempt from the <br /> requirements of this section provided that the annular <br /> $pace is monitored using either pressure or vacuum <br /> testing® <br /> (d) All monitoring programs shell include the follouin .i" <br /> (1) A writtea''\,,routiae monitoringprocedure which includes, <br /> when IPPli�o blet the frequency of pert rain the <br /> monitoring ngtho ® the methods and equipment to be user <br /> r <br /> for ;Ferfor Io ,t a monitoring, the location s) from <br /> which the monitoring will be perfor ad, the name(*) or <br /> titla(s) of the ecsoa(s) rcaonsib a for Performing <br /> the monitoring sad/or saints iaio ''the equipment® and <br /> the reporting format',, <br /> (2) A response plea developed by"«Che permit applicant whiob <br /> demonstrates® to the aat1iredtlon of the local agency, <br /> that any unauthorized role" `da will be removed from the <br /> secondery .coctsiaer with a thq 'shortest possible time <br /> and no longer then th Aime Consistent with the ability <br /> of the secondary container to contain the hazardous <br /> substance® The reppr6n8e plan shall include, but is not <br /> limited to, the followings <br /> (A) A descripttom- Of the Proposid methods and <br /> equipment to be used for removing °the hazardous <br /> substedce, including the'•lobition "nhd availability <br /> of the required equipment, if not permanently on- <br /> si o, and an equipment maintenance schedule for <br /> the equipment located on-lite. `et <br /> M/the name(a) or title(a) of the person(s) \ <br /> h responsible for authorizing the work to be <br /> performed. <br /> Authority: NASC 25299.3 <br /> Rererenoee H&3C 25281 , 25291 <br /> 3.9 <br />