Laserfiche WebLink
Sant By: PHL DESIGN GPUP; 7077853837' 5 <br /> Date April 30, 1999 <br /> EMERGENCE' RESPONSE PLAN <br /> UNDER4,3ROUND STORAGE TANK; MONIT'ORIN PROGRAM <br /> This monitoring program must b:kept at the UST lozation at all times. The lntorrnatioa i n this trmoniw ing program are <br /> tomttitiom cr the operating pertna. Tbc?crmit hoidcr must nodfy Count of San Joa uin .H.D. wltrtln 30 drys of any <br /> changes to rhe cionitcring pm-cedures,unless required to obtain appro,,"al before maktn} th change,. Required b7 Smtioas <br /> 2632(d)and 2641{h?CCR. <br /> Facility Name ��i_ ariaold Shell <br /> Facility Address 6131 Pacific Avenue. Stockton <br /> 1. if an unauthorized release occurs, hotY will the hazardous bstance be cleaned up'? <br /> Note: if released hazardous substances reach the enviro at, increase the fire or <br /> explosions hazard, are .not cleaned up from the secondar containment within 8 <br /> hours, or deteriorate the secondary coatainment, then oun f un juaguin <br /> 9- - 420 must be notified within 24 hours. F r small spills the ott_site <br /> personnel will use absor-Int m teriAl 19 clean un the released aterial. In the event of <br /> a larger spill, the dealer will call 9-1- (if necessML�ilion Re resentati�e and <br /> the Eguilon SH&cF: Coordinator w assist in the emere,�nc . _ <br /> 2. DesL:ribe the proposed methods and equipment to be used fa r removing and properly <br /> disposing of any hazardous substances. <br /> SRent absorbent will be placed into an approved container and lis2o 24 of in accordance <br /> with all Local. State, and Federal 1 ws and re ulaams. An dditional 2guigment w,u <br /> be nrov ides��ra ailing corttractor. <br /> 3 Describe the location and availability of the required cleanup a uipment in item 2 above, <br /> Absorbent is rnaintained on ;itc_and restocked as needed. A addit!;.onaleu' <br /> Maintained by the contractor, and available on an as needed <br /> 4. Describe the maintenance schedule for the cleanup equipment <br /> (hsorbent is ins tnected wzekly and reordered as needed. <br /> 5. List the oame(s) and titles) of the person(s) c-:spons-ble r authorizing any work <br /> necessary under the response plan. <br /> Hung Tran Stat' r <br /> Aura Mattis ! ' tti Safety, health Fnvironmeutal Coori linaior <br /> Alex Perez ! E uilon Environmental n `�ti ei ez -- <br /> Perry Pineda ! EQuilon Regional l;acilityEnri e-er. <br /> T ", Services / Maintenance Contractor — <br />