My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_1987 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 1:51:08 PM
Creation date
12/16/2019 11:48:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2001
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sant By: PHL DESIGN GPUP; 7077853837' 5 <br /> Date April 30, 1999 <br /> EMERGENCE' RESPONSE PLAN <br /> UNDER4,3ROUND STORAGE TANK; MONIT'ORIN PROGRAM <br /> This monitoring program must b:kept at the UST lozation at all times. The lntorrnatioa i n this trmoniw ing program are <br /> tomttitiom cr the operating pertna. Tbc?crmit hoidcr must nodfy Count of San Joa uin .H.D. wltrtln 30 drys of any <br /> changes to rhe cionitcring pm-cedures,unless required to obtain appro,,"al before maktn} th change,. Required b7 Smtioas <br /> 2632(d)and 2641{h?CCR. <br /> Facility Name ��i_ ariaold Shell <br /> Facility Address 6131 Pacific Avenue. Stockton <br /> 1. if an unauthorized release occurs, hotY will the hazardous bstance be cleaned up'? <br /> Note: if released hazardous substances reach the enviro at, increase the fire or <br /> explosions hazard, are .not cleaned up from the secondar containment within 8 <br /> hours, or deteriorate the secondary coatainment, then oun f un juaguin <br /> 9- - 420 must be notified within 24 hours. F r small spills the ott_site <br /> personnel will use absor-Int m teriAl 19 clean un the released aterial. In the event of <br /> a larger spill, the dealer will call 9-1- (if necessML�ilion Re resentati�e and <br /> the Eguilon SH&cF: Coordinator w assist in the emere,�nc . _ <br /> 2. DesL:ribe the proposed methods and equipment to be used fa r removing and properly <br /> disposing of any hazardous substances. <br /> SRent absorbent will be placed into an approved container and lis2o 24 of in accordance <br /> with all Local. State, and Federal 1 ws and re ulaams. An dditional 2guigment w,u <br /> be nrov ides��ra ailing corttractor. <br /> 3 Describe the location and availability of the required cleanup a uipment in item 2 above, <br /> Absorbent is rnaintained on ;itc_and restocked as needed. A addit!;.onaleu' <br /> Maintained by the contractor, and available on an as needed <br /> 4. Describe the maintenance schedule for the cleanup equipment <br /> (hsorbent is ins tnected wzekly and reordered as needed. <br /> 5. List the oame(s) and titles) of the person(s) c-:spons-ble r authorizing any work <br /> necessary under the response plan. <br /> Hung Tran Stat' r <br /> Aura Mattis ! ' tti Safety, health Fnvironmeutal Coori linaior <br /> Alex Perez ! E uilon Environmental n `�ti ei ez -- <br /> Perry Pineda ! EQuilon Regional l;acilityEnri e-er. <br /> T ", Services / Maintenance Contractor — <br />
The URL can be used to link to this page
Your browser does not support the video tag.