My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_1987 - 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2019 1:51:08 PM
Creation date
12/16/2019 11:48:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2001
RECORD_ID
PR0231223
PE
2361
FACILITY_ID
FA0002324
FACILITY_NAME
Pacific Service Station
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
01
SITE_LOCATION
6131 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERL INVENTORY R PORTING <br /> L <br /> Facility Name: ��� ��'�-- �'1 e 1 1 I Tank # Size Product <br /> Facility Address: co PQ 4(c' V P j <br /> City: . ' l.' <br /> County: ` -)q V �JoQ Y1�� C7�1 <br /> State: ��. 1 t T�r 1'1 1 <br /> Waste Oil <br /> These were inventory variations that I hereby certify that all product level variations <br /> ❑ exceeded the allowable limits for this for the above mentioned facility were <br /> quarter. within allowable limits for this quarter. <br /> LIST DATE, TANK # AND AMOUNT FOR ALL VARIATIONS OUT OF TOLERANCE <br /> THAT EXCEED THE ALLOWABLE LIMITS. INVESTIGATIVE STEPS <br /> Step 1 Review Records . <br /> Date Tank # Amount Explanation Step 2 New reconciliation <br /> performed. <br /> Step 3 Shell Oil notified. <br /> Step 4 Records review from <br /> the last stable <br /> situation. <br /> Step 5 Physical facilities <br /> inspected for leaks. <br /> Step 6 Dispenser meters <br /> calibrated. <br /> Step 7 Piping hydrostatically <br /> en <br /> tested. <br /> Step 8 Underground storage <br /> ;-NM0NMENTAj HL41tanks precision tested. <br /> Lc.f SPR0"ES Step 9 Additional investigation <br /> as required by Shell <br /> or the local agency. <br /> This quarterly summary report <br /> shall be submitted within 15 days <br /> after the end of each quarter. Check <br /> the quarter you are submitting <br /> ❑ Quarter 1 — January thru March <br /> ,-,� Submit by April 15 <br /> LJ Quarter 2 — April thru June <br /> Submit by July 15 <br /> ❑ Quarter 3 — July thru September <br /> Submit by October 15 <br /> ❑ Quarter 4— October thru December <br /> Submit by January 15 <br /> Send to (Local Agency): �`n �Doa U i lrl <br /> r n 2-ol <br /> KEEP COPIES OF THIS FORM FOR YOUR RECORDS <br /> Com( /( j/Lr DEALER SIGNATURE DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.